Table of Contents
Unpack rack(s)………………………………………………………………….. 1
Mount rack(s)…………………………………………………………………… 1
Terminate conduits…………………………………………………………….. 3
Convert bussing to single-phase………………………………………….…. 3
Pull power, load and control conductors to the racks……………………… 3
Connect power feeders………………………………………………………... 4
Label circuits……………………………………………………………………. 4
Connect load conductors……………………………………………………… 5
Low-voltage application notes………………………………………………… 5
Connect control conductors…………………………………………………… 6
Seal unused openings…………………………………………………………. 6
Install control module(s)……………………………………………………….. 7
Set thumbwheel switch(es)……………………………………………………. 8
Set non-dim switches………………………………………………………….. 8
Apply power and check………………………………………………………... 9
Install dimmers………………………………………………………………….. 9
Install filler modules………………………….…………………..……………. 9
Test loads……………………………………………………………………….. 9
Close door………………………………………………………………………. 10
Maintenance and Specifications ……………………………………………... 11
Warranty ………………………………………………………………………… 12
Содержание Topaz 24
Страница 4: ...FIGURE 1 MOUNTING DIMENSIONS Page 2 ...