Leviton EVPED Скачать руководство пользователя страница 2

Figure 1 - Install Concrete Pad (with Anchor Bolts and Conduit/Wire run)

Figure 2 - Pull Wires through Pedestal

Figure 3 - Secure Pedestal to Concrete Pad

Figure 4 - Secure Pedestal Ground Wire

Figure 6 - Mount Charging Station to Pedestal

Figure 5 - Assemble Conduit/Wire and secure to Pedestal

Pedestal

18" min.

18" min.

Concrete

Pad

6" 

6" 

*NOTE: Use dedicated circuits (1 for each charging staion) if a second charging station is to be installed on the opposite side of the pedestal.

2.25" min.

3" min.

5" min.

Anchor Bolt Placement

(dimensions)

6"

6"

8"

8"

ø

 1/2"

(4x)

Pedestal Base Plate (8" x 8")

Conduit

Charging Station

Conductors

* Pedestal Ground Wire

  

(if run through conduit - Path 2)

* Pedestal Ground Wire

  

(using ground strap - Path 1)

NOTE: Wires are pulled to left side of pedestal

where charging station is to be mounted.

Remove outlet box covers.

Pedestal

NOTE:

(Pedestal
ground wire
must extend
up to outlet
box openings)

Outlet Box

Cover

Outlet Box

Cover

Acorn Nut
Nut
Washer

Washer/Nut

 (for leveling - 
  if applicable)

Charging
station
mounted
on this side

NOTE: Leveling nuts and washers may be used if required.

PATH 2

(for use with ground rod)

Direct Burial Cable

To Service 

Equipment

Ground Lug

Ground Wire

for Pedestal

Ground Rod

PATH 1

(for use with ground strap)

Ground Lug

Ground Wire

for Pedestal

Ground Strap

(for metallic

conduit)

Outlet Box

Cover

Outlet Box

Opening

Metallic Conduit

To Service 

Equipment

Charging Station

Conductors

NOTE:

Pedestal ground wire

must be secured before

conduit assemblies are

affixed to the pedestal.

Use a flat head screwdriver

to access the ground lug

from the opposite side

outlet box opening.

90˚ Conduit

Fitting

Flexible

Conduit

Outlet Box Cover

(with 3/4 KO)

Tightening

Nut

Cut out 3/4" hole in

outlet box cover to

accept 90˚ conduit

fitting. 

Assemble conduit to outlet box

cover, pull wires through, and 

secure all to pedestal by tightening

outlet box screws to pedestal.

8-1/4"

Charging Station

Conductors

NOTE: Refer to EVSE Charging Station Installation Instructions for wiring the charging station.

Use spanner screws and toothlock washers

to secure charging station to pedestal.

Repeat installation instructions for opposite

side of pedestal if a second charging station

is to be installed.

Thread top screw and washer

onto pedestal.

1.

Hang charging station over

top screw and washer.

2.

Secure and tighten bottom

screw with washer and tighten

top screw.

3.

1

2

3

NOTE:

Please visit

Leviton.com/support

for a printable version

1:1 anchor bolt pattern

DI-000-EVPED-00A

WEB 