background image

ZL0139-0A 

Page 17 of 24 

05145 

Installation Guide

Power Monitoring

Series 4000-R

Setting

Value

Modbus 

Register

Setup Password

00000

Reset Password

00000

System Type

40 (3 + N) Wye

130

CT Primary Ratio (if CTs are not included)

100A

131

CT Secondary Ratio

1V

132

PT Ratio

1:1 (none)

133

System Voltage

600 V L-L

134

Max. Theoretical Power 
(Analog Output: full scale (20mA or 5V))

104 kW

135

Display Mode

1 (IEEE)

137

Phase Loss

10% of System Voltage (60V), 25% Phase to Phase Imbalance

142, 143

Pulse Energy

1 (kWh/pulse)

144

Demand: number of sub-intervals per interval

1 (block mode)

149

Demand: sub-interval length

900 sec (15 min)

150

Modbus Address

001

Modbus Baud Rate

19200 baud

Modbus Parity

None

Log Read Page

0

158

Logging Configuration Register

0

159

Log Register Pointer 1

1 (Real Energy MSR)

169

Log Register Pointer 2

2 (Real Energy LSR)

170

Log Register Pointer 3

29 (Reactive Energy MSR)

171

Log Register Pointer 4

30 (Reactive Energy LSR)

172

Log Register Pointer 5

37 (Real Demand)

173

Log Register Pointer 6

38 (Reactive Demand)

174

Log Register Pointer 7

39 (Apparent Demand)

175

Log Register Pointer 8

155 (Month/Day)

176

Log Register Pointer 9

156 (Year/Hour)

177

Log Register Pointer 10

157 (Minutes/Seconds)

178

Standard Modbus 
Default Settings

www.

.com

[email protected]

1.800.561.8187

Содержание 4000-R series

Страница 1: ...tial failure modes of control paths and for certain critical control functions provide a means to acheive a safe state during and after a path failure Examples of critical control functions are emerge...

Страница 2: ...0 5 to 0 6 N m Terminal Block Wire Size 24 to 14 AWG 0 13 to 2 08 mm2 Rail T35 35mm DIN Rail per EN50022 OPERATING CONDITIONS Operating Temperature Range 30 to 70 C 22 to 158 F Storage Temperature Ra...

Страница 3: ...g 8 Control Power 9 Quick Setup Instructions 10 Solid State Output 11 User Interface Menu Abbreviations Defined 11 User Interface for Data Configuration 12 Alert Reset Information 13 User Interface fo...

Страница 4: ...ption FullDataSet FDS Power kW Energy kWh Configurable for CT PT ratios system type and passwords Diagnostic alerts Current 3 phase average Volts 3 phase average Current by phase Volts by phase Line L...

Страница 5: ...s areclosed CONTROL POWER 0 1A 50 60 Hz A B C N 1 2 Alarm Energy NC NO S OUTPUT VA VB VC Neutral Earth Control Power UL 90V L N 600V L L CE 90V L N 300V L N VOLTAGE INPUTS CAT III 50 60 Hz X2 A X1 X2...

Страница 6: ...ing by sliding them into the slots from the inside The stopping pegs must face the housing and the outside edge of the clip must be flush with the outside edge of the housing 2 Snap the clips onto the...

Страница 7: ...Qty ID Type Modbus Register 130 User Interface SETUP S SYS VLL VLN Balance Diagram number Single PhaseWiring 2 1 A 2 A N L N 10 1L 1n AN 1 2 1 A 2 A B L L 11 2L AB 2 3 2 A B 3 A B N L L with N 12 2L 1...

Страница 8: ...X2 X1 A B C N A B C N White Black White Black X1 X2 X1 X2 X1 X2 L1 L2 X2 X1 A B C N A B C White Black X1 X2 X1 X2 X1 X2 Diagram3 1 PhaseDirectVoltageConnection2CT L1 L2 L3 X2 X1 A B C N A B C X2 X1 X2...

Страница 9: ...rce obey local and national code requirements For selecting fuses and circuit breakers use the following criteria Select current interrupt capacity based on the installation category and fault current...

Страница 10: ...ough the digits Use the or buttons to select the CT size in amps b back to the S CT screen 7 to the S SYS Set System screen a to the SYSTM screen Use the or buttons to select the System Type see wirin...

Страница 11: ...al Number RESET RESET Reset Data PASWD PASWD Enter Reset or Setup Password ENERG ENERG Reset Energy Accumulators DEMND DEMND Reset Demand Maximums User Interface UI Menu Abbreviations Defined The user...

Страница 12: ...C VAC C KW C VLN A KVA B KVA C KVA A PF 3 PF B PF C PF 3KVAR Total Reactive Power Q AKVAR BKVAR CKVAR KVARh KVAh Accumulated Reactive Energy Qh Accumulated Apparent Energy Sh DEMND D KW Present Real P...

Страница 13: ...ber Energy Pulse Output Error Overrun Error ConF Configuration Error PULSE Error ENERG rES Reset Energy Accumulators to 0 Unit Information Alert Status check if Wrench on LCD RESET Enter Reset Passwor...

Страница 14: ...stalled See Install for wiring diagrams This value must be set before the System Voltage if used Potential Transformer RATIO 001 00 Back S V Back Sytem Voltage Next Set System Voltage V LL The nominal...

Страница 15: ...nostic Alert Bitmap if equipped Wh P Set Pulse Energy In Watt Hours VAR Hours if present per Pulse When moving down to a smaller energy the meter will not allow the selection if it cannot find a pulse...

Страница 16: ...S 485 transceivers are unit load or less RS 485 has a 47 k pull up to 5V and RS 485 has a 47 k pull down to Shield RS 485 signal ground Wire the RS 485 bus as a daisy chain from device to device witho...

Страница 17: ...er interval 1 block mode 149 Demand sub interval length 900 sec 15 min 150 Modbus Address 001 Modbus Baud Rate 19200 baud Modbus Parity None Log Read Page 0 158 Logging Configuration Register 0 159 Lo...

Страница 18: ...n Series 4000R Power Meter Full Data Set RESET SYSTEM RUNNING RSVersion x xxx last 2 bytes CRC 0x2B Read Device Identification BASIC implementation 0x00 0x01 and 0x02 data Conformity Level 1 Object va...

Страница 19: ...C 019 R UInt Volt V 0 32767 Voltage Phase A N 020 R UInt Volt V 0 32767 Voltage Phase B N 021 R UInt Volt V 0 32767 Voltage Phase C N 022 R UInt Amp I 0 32767 Current Instantaneous Phase A 023 R UInt...

Страница 20: ...31 40 Single Phase A N SystemType Single Phase A B Single Split Phase A B N 3 phase A B C no N 3 phaseY A B C N 131 R W NV UInt Amps 20 5000 CT Ratio Primary Current Inputs 132 R NV UInt n a Reserved...

Страница 21: ...hase loss alarm bit in register 146 will be true Phase Loss Output Note The phases tested are determined by the SystemType 143 R W NV UInt 1 99 Phase Loss ImbalanceThreshold in Percent Default is 25 p...

Страница 22: ...the number of sub intervals that make a single demand interval For block demand set this to 1 Demand Calculation 150 R W NV UInt Seconds 0 10 32767 Sub Interval Length in seconds For sync to comms se...

Страница 23: ...t kVAR Reactive Power Phase A 321 322 R Float kVAR Reactive Power Phase B 323 324 R Float kVAR Reactive Power Phase C 325 326 R Float kW Total Real Power Present Demand 327 328 R Float kVAR Total Reac...

Страница 24: ...perly Check all CTs and PTs to verify correct connection to the same service PT polarity and adequate powering See theWiring Diagrams section for more information Cannot communicate with power meter f...

Отзывы: