Fast commissioning / operating principle
Leuze electronic GmbH + Co. KG
AMS 348
i
SSI
13
TNT
35/7-2
4V
3.2
Connecting the voltage supply
The laser measurement system is connected using M12 connectors. The voltage supply is
connected via the PWR M12 connection (18 … 30VDC). 2 freely programmable switching
inputs/outputs for individual adaptation to the respective application are also available here.
Detailed information can be found in Chapter 7.
3.3
Display
Once the laser measurement system is supplied with voltage, the device status as well as
the measured position values can be read on the display. The display automatically switches
to the display of the measurement values.
Use the up/down buttons
to the left of the display to read and change a wide range
of data and parameters.
Detailed information can be found in Chapter 8.
3.4
AMS 348
i
SSI on PROFINET
Install the GSDML file associated with the AMS 348
i
SSI in the PROFINET Manager of your
control. Activate the desired modules (at least one module).
The network address for PROFINET is assigned via the PROFINET Manager.
Standalone operation in PROFINET network
During standalone operation of the AMS 348
i
SSI, the PROFINET network is connected to
BUS IN. BUS OUT requires no terminating resistor.
Network mode in PROFINET network
In network mode the AMS 348
i
SSI is connected to PROFINET via BUS IN. Further
PROFINET participants can be connected to the integrated switch of the AMS 348
i
SSI via
the BUS OUT connection.
Commissioning of AMS 348
i
SSI
The procedures described below are for the configuration of an AMS 348
i
SSI with a Siemens
Simatic S7 PLC.
• Switching on the supply voltage.
The AMS 348
i
SSI displays the "Status and measurement data" main menu.
• Installation of the corresponding GSD file in the Simatic Hardware Manager.
• Projection of the PROFINET network including the AMS 348
i
SSI GSD file. Definition
of the IP addresses, sub-network mask and definition of a device name assigned to
the IP address.
• Download of the project to the connected Siemens control.
Further information regarding the individual commissioning steps is provided in see
chapter 9.8.4 "Configuration steps for a Siemens Simatic S7 control".
Detailed information can be found in Chapter 9.