background image

1、Set the temperature(rotate the temperature adjustment knob(9)).

2、Set the walking speed(rotate the walking speed adjustment knob(5)).

3、Turn on the blower power switch (8).

4、When the temperature of the air gun reaches the set value, insert the air nozzle(1)

    between the upper film and the lower film to be welded(as shown below).

5、Press the handle(3)with your hand.

6、Turn on the moving switch (6).

7、The machine should pay attention to the pressure roller(2)edge and the  relative

    position of the edge of the film. 

8、After welding, lift the machine slightly and move the air nozzle(1)away from the

    welding position.

9、Turn off the moving switch (6).

10、Turn off the air blower power switch (8) after the air blower cools down .

LST-TAC Operations

1、Nozzle 

                                           2、Pressure Roller                        

3、Handle 

                                           4、Main Power Wire                        

5、Walking Speed Adjustment Knob         6、Moving Switch          

7、Hot Air Blower Power Wire                   8、Blower Power Switch                  

9、Temperature Adjustment Knob            10、Hot Air Blower                           

11、Crawling Wheel

04

LST-TAC

LESITE

EN

Содержание LST-TAC

Страница 1: ...LST TAC Roofing Hot Air Welder Manual Lesite Technology LESITE ...

Страница 2: ...le materials or explosive gas Please do not touch the hot wedge during welding work or when the welding machine has not completely cooled down so as not to burn The power supply voltage must match the rated voltage marked on the welding machine and be reliably grounded Connect the welding machine to a socket with a protective ground conductor In order to ensure the safety of the operators and the ...

Страница 3: ...eld width Size L W H Net Weight 230 120 V 50 60 Hz 1700 W 0 5 5 0 m min 50 620 40 mm 270 160 420 mm 5 KG 02 LST TAC LESITE EN The model identification and serial number identification are marked on the nameplate of the machine you choose Please provide these data when consulting Lesite Sales and Service Center ...

Страница 4: ...oller 3 Handle 4 Main Power Wire 5 Walking Speed Adjustment Knob 6 Moving Switch 7 Hot Air Blower Power Wire 8 Blower Power Switch 9 Temperature Adjustment Knob 10 Hot Air Blower 11 Crawling Wheel 4 5 6 7 8 9 10 1 2 3 11 03 LST TAC LESITE EN ...

Страница 5: ...m and the lower film to be welded as shown below 5 Press the handle 3 with your hand 6 Turn on the moving switch 6 7 The machine should pay attention to the pressure roller 2 edge and the relative position of the edge of the film 8 After welding lift the machine slightly and move the air nozzle 1 away from the welding position 9 Turn off the moving switch 6 10 Turn off the air blower power switch ...

Страница 6: ...our sole discretion to meet the warranty requirements The quality assurance does not include damage to wearing parts Heating core pressure roller etc damage or defects caused by improper handling ormaintenance and damage caused by falling products Irregular use and unauthorized modification should not be covered by the warranty Use steel brush to clean the hot air nozzle Clean the air inlet at the...

Страница 7: ...arts It is strongly recommended to send the product to Lesite company or authorized repair center for professional inspection and repair Only original Lesite spare parts are allowed 06 LST TAC LESITE EN 1One year warranty ...

Страница 8: ...ot Air Welder 05 2022 EN FUZHOU LESITE PLASTICS WELDING TECHNOLOGY CO LTD Add 5 Jingpu Road Pushang Industry Park Cangshan Fuzhou 350007 Fujian China Tel 86 591 83818890 E mail info lesite com cn Web www lesiteweld com ...

Отзывы: