6
t
Before the First Use
➪
Remove the steam iron from the packaging.
➪
Remove all stickers and films from the steam iron and the
gliding sole
.
➪
Plug the power plug into a power socket of
230 V~/50 Hz.
➪
Hold the steam iron horizontally.
➪
Set the temperature control
to the position "Max“.
➪
Heat the steam iron for several minutes on the
highest setting.
➪
Iron on a piece of scrap material to remove any possible
unclean patches from the gliding sole.
Operating Elements, ill. A
Movable cable guide
Temperature control light
Cable winding space
Standing foot
Gliding sole
Water nozzle
Filler opening for the water reservoir
Steam amount control
Button for the steam spray
Button for water fog
Temperature control
Handle
Operation
Filling with Tap Water
➪
When it is cool, place the steam iron in a horizontal position
on its gliding sole
.
➪
Open the filler opening for the water reservoir
.
➪
Fill the reservoir with tap water using the measuring cup, at
most to the "Max" marking.
➪
Close the water reservoir filler opening, making sure it "clicks"
shut.
KH1280_Steam_Iron_content_UK 05.02.2004 12:12 Uhr Seite 6
Содержание KH 1280
Страница 1: ...Steam Iron KH 1280 Operating Manual KH1280 UK ...
Страница 2: ......
Страница 3: ......
Страница 11: ...www kompernass com ...
Страница 12: ...www kompernass com ...
Страница 13: ...Kompernaß Handelsgesellschaft mbH Burgstrasse 21 44867 Bochum www kompernass com ID NR KH1280 02 04 ...