background image

15 

 

Maintenance and Service 

 

 

If the device requires servicing of any kind, the user is required to disconnect and remove it 
from its mounting. The initial installation should be done in a way that makes this as 
convenient as possible. 
 

 

Voltage/Power lines should be properly insulated as well as other cables. Be careful when 
handling them so as to not trip over. 

 

 

Do not under any circumstance insert foreign objects of any kind into the heat dissipation 
holes located in the different faces of the device. This may not only harm the internal layout, 
but might cause harm to user as well. 

 

 

Do not under any circumstance open the device for any reason. Please contact your dealer for 
any repair needed or follow the instructions within the manual. 

 

 

Clean the device with dry soft cloth. 
 

 
 
 
 
 
 
 
 
 
 
 

Содержание PT5-0501-M-24 Series

Страница 1: ...Leonton PT5 0501 M 24 Series PT5 0501 M 24 PT5 0501 M 24 T User Manual...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between t...

Страница 4: ...hysical Dimensions 4 Front Panel 5 Top View 5 LED Indicators 5 Ethernet Ports 7 Cabling 8 Wiring the Power Inputs 8 Wiring the Fault Alarm Contact 9 Grounding Note 10 Mounting Installation 11 DIN Rail...

Страница 5: ...of 40 to 75 C this series is designed to meet any needs for industrial automation outdoor application and harsh environments Software Features Network Redundancy STP RSTP MSTP ITU T G 8032 Ethernet R...

Страница 6: ...connector Multi Single mode Store and forward switching architecture 8K MAC Address Table 1Mbits memory buffer Power Input Redundant power DC 12 55V with connective 1 6 pin removable terminal block Ma...

Страница 7: ...input The industrial Ethernet switch s hardware specs ports cabling information and wiring installation will be described within this user manual Warning Labels The caution label means that you should...

Страница 8: ...4 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of PT5 0501 M 24 series W x D x H is 46mm x 99mm x 142mm Figure 2 1 PT5 0501 M 24 Series Physical Dimensions...

Страница 9: ...hows the top panel of the PT5 0501 M 24 series switch that is equipped with one 6 pin removal terminal block connector for dual DC power inputs 12 55VDC Figure 2 3 Top Panel View of PT5 0501 M 24 Seri...

Страница 10: ...is active and works well Flashing ERPS Ring works abnormally or misconfigure Off ERPS Ring Network is not active L A Fiber Port 5 Green On Connected to network 100Mbps Flashing Networking is active O...

Страница 11: ...raight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 5 1000BASE T RJ 45...

Страница 12: ...e above cabling for RJ 45 port connections The cable between the switch and the link partner switch hub workstation etc must be less than 100 meters 328 ft long Fiber segment using single mode connect...

Страница 13: ...the terminal block connector as the picture shows below in Figure 2 10 By inserting the wires it will detect the fault status including power failure or port link failure managed industrial switch on...

Страница 14: ...romagnetic interference EMI Run the ground connection from the ground screw to the grounding surface prior to connecting devices The grounding screw symbol is shown blow in Figure 2 11 Figure 2 11 Gro...

Страница 15: ...to install the DIN Rail on the switch Figure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to in...

Страница 16: ...w in Figure 3 2 Figure 3 2 Insert the Switch on the DIN Rail Step 4 Lightly pull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if t...

Страница 17: ...brackets on the top and bottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of...

Страница 18: ...ation Step 3 To hang the industrial Ethernet switch on a DIN Rail or wall please refer to the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light...

Страница 19: ...l as other cables Be careful when handling them so as to not trip over Do not under any circumstance insert foreign objects of any kind into the heat dissipation holes located in the different faces o...

Страница 20: ...ssist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicatio...

Отзывы: