Leonton PT2-1002-2C-24 Series Скачать руководство пользователя страница 18

14 

Hardware Installation 

Installation Steps 

This section will explain how to install PT2-1002-2C-24 series.

 

 

Installation Steps

 

Step 1. 

Unpack the industrial Ethernet switch from the original packing box.

 

Step 2. 

Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.

 

 

If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the 

DIN-Rail 

Mounting

 section for DIN-Rail installation.

 

 

If you want to wall mount the industrial Ethernet switch, please refer to the 

Wall Mounting

 

section for wall mounting installation.

 

Step 3. 

To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the 

Mounting 

Installation

 section.

 

Step 4. 

Power on the industrial Ethernet switch and then the power LED light will turn on.

 

 

If you need help on how to wire power, please refer to the 

Wiring the Power Inputs

 section.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 5. 

Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.

 

Step 6. 

Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side into 

the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) 

LED  on  the  industrial  Ethernet  switch  will  turn  on  when  the  cable  is  connected  to  the 

networking device.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 7. 

When  all  connections  are  set  and  the  LED  lights  all  show  normal,  the  installation  is 

complete.

 

Содержание PT2-1002-2C-24 Series

Страница 1: ...Leonton PT2 1002 2C 24 Series PT2 1002 2C 24 PT2 1002 2C 24 T User Manual Version 1 0...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between t...

Страница 4: ...ption 3 Physical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 6 Cabling 7 Wiring the Power Inputs 9 Wiring the Fault Alarm Contact 10 Mounting Installation 11 DIN Rail Mountin...

Страница 5: ...ature of 10 C 65 C and another with a wide operating temperature of 40 C 75 C this series is designed to meet any needs for industrial automation application and harsh environments Key Features Interf...

Страница 6: ...ntion If the DC voltage is supplied by an external circuit please use a protection device on the power supply input Supply by UL Listed industrial use power The industrial Ethernet switch s hardware s...

Страница 7: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of PT2 1002 2C 24 series W x H x D is 46mm x 142mm x 99mm Figure 2 1 PT2 1002 2C 24 Series Physical Dimensions...

Страница 8: ...hown below in Figure 2 2 Figure 2 2 The Front Panel of PT2 1002 2C 24 Series Top View Figure 2 3 below shows the top panel of the PT2 1002 2C 24 series switch that is equipped with one 6 pin removal t...

Страница 9: ...tworking is active Off Not connected to network Green On Connected to network 10Mbps Flashing Networking is active Off Not connected to network LAN Port G1 G2 with COMBO Port LINK ACK SPEED Green On C...

Страница 10: ...raight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45...

Страница 11: ...t optical transceiver used in optical communications for both telecommunication and data communication applications To connect the transceiver and LC cable please follow below steps Step 1 Insert the...

Страница 12: ...ure 2 11 Figure 2 11 LC Connector to the Transceiver To remove the LC connector from the transceiver please follow the steps shown below Step 1 Press the upper side of the LC connector from the transc...

Страница 13: ...Insert the positive and negative wires into the PWR1 V1 V1 and PWR2 V2 V2 contacts on the terminal block connector as shown below in Figure 2 14 Figure 2 14 Power Terminal Block Step 2 Tighten the wi...

Страница 14: ...luding power failure or port link failure managed industrial switch only and form a normally open circuit An application example for the fault alarm contact is shown below in Figure 2 16 Figure 2 16 W...

Страница 15: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Страница 16: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Страница 17: ...ottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Страница 18: ...to the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Power...

Страница 19: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...

Отзывы: