background image

Step 2. 

Insert  the  fiber  cable  of  the  LC  connector  into  the  transceiver  as  shown  below  in  Figure 

2.11.

 

 

Figure 2.11: LC Connector to the Transceiver 

 

To remove the LC connector from the transceiver, please follow the steps shown below:

 

Step 1. 

Press the upper side of the LC connector from the transceiver and pull it out to release as 

shown below in Figure 2.12

 

 

Figure 2.12: Remove LC Connector

 

 

Содержание PG2-0601-SFP Series

Страница 1: ...Leonton PG2 0601 SFP Series PG2 0601 SFP PG2 0601 SFP T User Manual Version 1 0...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between t...

Страница 4: ...sical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 6 Cabling 7 Wiring the Power Inputs 9 Wiring the Fault Alarm Contact 11 DIP Switch Settings 12 Mounting Installation 13 DIN...

Страница 5: ...10 C 65 C and another with a wide operating temperature of 40 C 75 C this series is designed to meet any needs for industrial automation application and harsh environments Key Features Interface Perfo...

Страница 6: ...tion If the DC voltage is supplied by an external circuit please use a protection device on the power supply input Supply by UL Listed industrial use power The industrial Ethernet switch s hardware sp...

Страница 7: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of PG2 0601 SFP series W x H x D is 30mm x 142mm x 99mm Figure 2 1 PG2 0601 SFP Series Physical Dimensions...

Страница 8: ...is shown below in Figure 2 2 Figure 2 2 The Front Panel of PG2 0601 SFP Series Top View Figure 2 3 below shows the top panel of the PG2 0601 SFP series switch that is equipped with one 6 pin removal t...

Страница 9: ...s inactive Fault Red On Power input 1 or 2 is inactive Off Power input 1 and 2 are both functional SFP Port LINK ACT Green On Connected to network Flashing Networking is active Off Not connected to ne...

Страница 10: ...aight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45 P...

Страница 11: ...t optical transceiver used in optical communications for both telecommunication and data communication applications To connect the transceiver and LC cable please follow below steps Step 1 Insert the...

Страница 12: ...ure 2 11 Figure 2 11 LC Connector to the Transceiver To remove the LC connector from the transceiver please follow the steps shown below Step 1 Press the upper side of the LC connector from the transc...

Страница 13: ...13 Figure 2 13 Pull Out from the SFP Module Wiring the Power Inputs Please follow the below steps to insert the power wire Step 1 Insert the positive and negative wires into the PWR1 V1 V1 and PWR2 V...

Страница 14: ...crews to prevent the wires from loosening as shown below in Figure 2 15 Figure 2 15 Power Terminal Block Note Only use copper conductors 60 75 C tighten to 5 lbs The wire gauge for the terminal block...

Страница 15: ...luding power failure or port link failure managed industrial switch only and form a normally open circuit An application example for the fault alarm contact is shown below in Figure 2 16 Figure 2 16 W...

Страница 16: ...IP Switch Settings The following describes the DIP switch settings DIP Switch ON OFF 1 Enable Energy Efficient Ethernet Disable Energy Efficient Ethernet 2 Set SFP speed to 100Mbps Set SFP speed to 1G...

Страница 17: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Страница 18: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Страница 19: ...ottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Страница 20: ...o the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Power...

Страница 21: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...

Отзывы: