background image

10 

Hardware

 

Installation

 

Installation

 

Steps

 

This

 

section

 

will

 

explain

 

how

 

to

 

install

 

ET2

0500

M12

67

 

series.

 

 

 

Caution:

  

1.

 

This

 

device

 

is

 

intended

 

for

 

use

 

indoor

 

and

 

at

 

altitudes

 

up

 

to

 

2000

 

meters.

 

In

 

addition,

 

the

 

environmental

 

condition

 

should

 

be

 

maximum

 

relative

 

humidity

 

80

 

%

 

for

 

temperatures

 

up

 

to

 

31

 

°C

 

decreasing

 

linearly

 

to

 

50

 

%

 

relative

 

humidity

 

at

 

40

 

°C.

 

2.

 

The

 

device

 

is

 

intended

 

to

 

be

 

installed

 

in

 

an

 

industrial

 

control

 

enclosure

 

and

 

panel.

 

3.

 

For

 

use

 

in

 

a

 

controlled

 

environment.

 

Refer

 

to

 

manual

 

for

 

environmental

 

conditions.

 

ATTENTION:

 

POUR

 

UTILISATION

 

EN

 

ATMOSPHÈRE

 

CONTRÔLÉE.

 

CONSULTER

 

LA

 

NOTICE

 

TECHNIQUE.

 

 

 

ATTETNION

 

1.

 

Cet

 

appareil

 

est

 

conçu

 

pour

 

être

 

utilisé

 

à

 

l’intérieur

 

et

 

à

 

des

 

altitudes

 

allant

 

jusqu’à

 

2000

 

mètres.

 

De

 

plus,

 

les

 

conditions

 

ambiantes

 

doivent

 

être

 

une

 

humidité

 

relative

 

maximale

 

de

 

80%

 

pour

 

des

 

températures

 

allant

 

jusqu'à

 

31

 

°

 

C,

 

diminuant

 

linéairement

 

jusqu'à

 

une

 

humidité

 

relative

 

de

 

50%

 

à

 

40

 

°

 

C.

 

2.

 

L'appareil

 

est

 

destiné

 

à

 

être

 

installé

 

dans

 

un

 

boîtier

 

et

 

un

 

panneau

 

de

 

commande

 

industriels.

 

3.

 

Pour

 

une

 

utilisation

 

dans

 

un

 

environnement

 

contrôlé.

 

Reportez

vous

 

au

 

manuel

 

pour

 

les

 

conditions

 

environnementales.

 

 
 

Installation

 

Steps

 

Step

 

1.

 

Unpack

 

the

 

industrial

 

Ethernet

 

switch

 

from

 

the

 

original

 

packing

 

box.

 

Step

 

2.

 

To

 

hang

 

the

 

industrial

 

Ethernet

 

switch

 

on

 

a

 

wall

 

or

 

DIN

Rail,

 

please

 

refer

 

to

 

the

 

Mounting

 

Installation

 

section.

 

Step

 

3.

 

Power

 

on

 

the

 

industrial

 

Ethernet

 

switch

 

and

 

then

 

the

 

power

 

LED

 

light

 

will

 

turn

 

on.

 

 

If

 

you

 

need

 

help

 

on

 

how

 

to

 

wire

 

power,

 

please

 

refer

 

to

 

the

 

Wiring

 

the

 

Power

 

Inputs

 

section.

 

 

Please

 

refer

 

to

 

the

 

LED

 

Indicators

 

section

 

for

 

LED

 

light

 

indication.

 

Step

 

4.

 

Prepare

 

the

 

M12

 

cable

 

for

 

Ethernet

 

connection.

 

Step

 

5.

 

Insert

 

one

 

side

 

of

 

the

 

M12

 

cable

 

into

 

switch’s

 

Ethernet

 

port

 

and

 

on

 

the

 

other

 

side

 

into

 

the

 

networking

 

device’s

 

Ethernet

 

port.

 

The

 

Ethernet

 

port’s

 

LED

 

on

 

the

 

industrial

 

Ethernet

 

switch

 

will

 

turn

 

on

 

when

 

the

 

cable

 

is

 

connected

 

to

 

the

 

networking

 

device.

 

Содержание ET2-0500-M12-67 Series

Страница 1: ...Leonton ET2 0500 M12 67 Series ET2 0500 M12 67 ET2 0500 M12 T67 User Manual Version 1 0...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Страница 3: ...imites de la classe A pour les quipements num riques conform ment la section 15 des R glementations FCC Ces limites sont con ues pour fournir une protection raisonnable contre toutes interf rences nui...

Страница 4: ...equired to take adequate measures CE Mark AVERTISSEMENT Ceci est un produit de classe A Dans un environnement domestique ce produit peut tre utilis en pr sence d interf rences radio This document is t...

Страница 5: ...ution 1 Hardware Description 2 Physical Dimensions 2 Front Panel 3 LED Indicators 4 Grounding 4 Ethernet Ports 4 Wiring the Power Inputs 6 Mounting Installation 7 Wall Mounting 7 DIN Rail Mounting 8 H...

Страница 6: ...ng an operating temperature of 10 C 65 C and another with a wide operating temperature of 40 C 75 C this series is designed to meet any needs for industrial automation application and harsh environmen...

Страница 7: ...nie par un circuit externe veuillez utiliser un dispositif de protection sur l entr e d alimentation Fourniture par courant industriel homologu UL Les sp cifications mat rielles du commutateur Etherne...

Страница 8: ...dware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of ET2 0500 M12 67 series W x H x D is 37 13mm x 215 73mm x 32 8mm Figure 2 1 ET2 0500 M12 67 Series Physical Dimen...

Страница 9: ...3 Front Panel The front panel of the ET2 0500 M12 67 series industrial unmanaged Ethernet switch is shown below in Figure 2 2 Figure 2 2 The Front Panel of ET2 0500 M12 67 Series...

Страница 10: ...on for Power ACT is for Activity and L A is for Link Activity Grounding Grounding and wire routing help limit the effects of noise due to electromagnetic interference EMI Run the ground connection fro...

Страница 11: ...Female Connector Illustration Pinouts 10 100Base T X Signal 1 Transmit Data TX 2 Receive Data RX 3 Transmit Data TX 4 Receive Data RX Table 2 2 Pin assignment of M12 Ethernet connector NOTE and signs...

Страница 12: ...een 18 24AWG Please follow the below steps to insert the power wire Step 1 Insert the positive and negative power wires into the power connector on the industrial Ethernet switch with pin4 pin1 V1 V1...

Страница 13: ...e top and bottom side of the switch to make 2 screw holes on a wall accordingly Step 3 Insert the screws through the screw holes on the switch and screw the switch into the wall Step 4 To remove the s...

Страница 14: ...l Ethernet switch and how to hang the switch Step 1 Use the screws to install the DIN Rail bracket on the rear side of the industrial Ethernet switch as shown in Figure 3 1 Figure 3 1 The Rear Side of...

Страница 15: ...switch 1 Insert the top of the DIN Rail on to the track 2 Lightly pull down the bracket on to the rail 3 Check if the bracket is mounted tightly on the rail Figure 3 2 Install the Ethernet switch on...

Страница 16: ...nuant lin airement jusqu une humidit relative de 50 40 C 2 L appareil est destin tre install dans un bo tier et un panneau de commande industriels 3 Pour une utilisation dans un environnement contr l...

Страница 17: ...11 Please refer to the LED Indicators section for LED light indication Step 6 When all connections are set and the LED lights all show normal the installation is complete...

Страница 18: ...help to identity if any problems exist Please refer to the LED Indicators section for LED light indication 4 If the power indicator LED does not turn on when the power cord is plugged in the user may...

Отзывы: