18
Hardware Installation
Installation Steps
This section will explain how to install BG5-1204-SFP series.
Installation Steps
Step 1.
Unpack the industrial Switch from the original packing box.
Step 2.
Check if the DIN-Rail bracket is screwed on the industrial Switch.
•
If the DIN-Rail is not screwed on the industrial Switch, please refer to the
DIN-Rail Mounting
section for DIN-Rail installation.
•
If you want to wall mount the industrial Switch, please refer to the
Wall Mounting
section
for wall mounting installation.
Step 3.
To hang the industrial Switch on a DIN-Rail or wall, please refer to the
Mounting
Installation
section.
Step 4.
Power on the industrial Switch and then the power LED light will turn on.
•
If you need help on how to wire power, please refer to the
Wiring the Power Inputs
section.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 5.
Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
Step 6.
Insert one side of the RJ-45 cable into Switch
’s Ethernet port and on th
e other side into
the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ
-45)
LED on the industrial Switch will turn on when the cable is connected to the networking
device.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 7.
Insert one side of the SFP cable into Switch
’s
SFP port and on the other side into the
networking device’s
SFP port, e.g. switch or server. The SFP
port’s LED on the industrial
Switch will turn on when the cable is connected to the networking device.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 8.
When all connections are set and the LED lights all show normal, the installation is
complete.