background image

SETUP INSTRUCTIONS

LEONARD

THERMOSTATIC

H

1017

ASSE

ASSE
1017

C

H

THERMOSTATIC

LEONARD

C

40

20

10

0

30

20

0

°F

140

LEONARD

60

°C

0

-10

10

12

0

R

40

50

60

80

HOT

INLET

COLD

INLET

V2R

V1R

LVR

THERMOMETER

SVR

V2L

V1L

LVL

SVL

8.

Open ball valve V2R and shut ball valve V2L at the mixing 
valve.

9.

Set outlet temperature of the mixing valve LVR to the same 
temperature as STEP 7.

10. Turn off enough fixtures for a flow of at least 2 GPM (7.6 

l/min) downstream from this system. Make sure each fixture 
is set to deliver full "HOT" water.

11. Open V1L, shut off  ball valve V2R.
12. Set outlet temperature of mixing valve SVL to the same 

temperature as Step 7.

13. Open V1R and shut V1L, set outlet temperature of SVR 

mixing valve to the same temperature as STEP 7.

14. Open all outlets. System is operational. To balance 

circulation system temperature, see page 5 . 

1. The Parallel Unit MUST be piped according to a Leonard 

Required Piping Method 5 (see page 4). 

2. Make sure full hot and cold supplies to this assembly are 

operating. The temperature of the hot water source must be 
properly set and maintained. 

3. The circulator (if used) must be turned OFF before setup. 
4. Turn on enough fixtures for a flow of at least 30 GPM (114 

l/min.) downstream from this system. Make sure each fixture 
is set to deliver full "HOT" water. 

5. Close outlet ball valves V1R,V2R, V1L. 
6. Make sure ball valve V2L is in the full open position.
7. Set outlet temperature of the mixing valve LVL to the required 

level.

NOTE! FOR OPTIONAL OUTLET SETUP PIPING ARRANGEMENT, SEE PAGE 12

4

Содержание TM-1520A-DT

Страница 1: ...tem MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions 1 Type TM Parallel Systems are factory pre assembled and...

Страница 2: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Страница 3: ...STOP SCREW located on the RIGHT SIDE OF THE COVER 5 The new maximum temperature has now been set Test this temperature by holding a thermometer under the flow of water to be certain it is as desired...

Страница 4: ...t V1L set outlet temperature of SVR mixing valve to the same temperature as STEP 7 14 Open all outlets System is operational To balance circulation system temperature see page 5 1 The Parallel Unit MU...

Страница 5: ...G VALVE 1 APPROXIMATELY HALF WAY AND START CIRCULATOR KEEP BALANCE VALVE 2 CLOSED AT THIS TIME 2 OBSERVE TEMPERATURE UNTIL IT STABILIZES 3 CLOSE BALANCING VALVE 1 SLIGHTLY IF TEMPERATURE IS TOO HOT OR...

Страница 6: ...will go then screw the port sleeve nut into the base The port sleeve and thimble may be lifted out SEE DWG BELOW 5 Clean in a non corrosive cleaning solution DO NOT USE ABRASIVES The port sleeve shoul...

Страница 7: ...TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 PORT SLEEVE 313 ASSY 4724 SCREEN PACKING LOWER STEM NUT ASSY PORT SLEEVE 2 EA 4733 SPRING POINTER ROD MU 5...

Страница 8: ...CKING 013 MU 5A O RING SCREEN 4519 UPPER STEM 03 05 PACKING PKG 2 EACH KIT R 28 REBUILDING KIT KIT 2 28Y CHECKSTOP KIT 013 SCREEN CONTROL ASSEMBLY KIT 1 28Y PACKINGS GASKETS LOWER STEM O RING 2 EACH H...

Страница 9: ...oil remove coil sleeve stud and take off thermostat group 6 Clean with a non corrosive cleaning solution DO NOT USE ABRASIVES 7 When reassembling make sure driving ball of thermostat group engages the...

Страница 10: ...rial s 09 125 RF CP 152 Serial s 2 EA 03 LOWER STEM PACKING COIL SLEEVE TM 8 STUD 03 PACKING LOWER STEM 2 EA 014 CAP PACKING CAP PACKING SPRING 1529 014 O RING MU 5A O RING MU 5A NUT ASSY PORT SLEEVE...

Страница 11: ...SLEEVE POINTER ROD NUT RETAINING RING POINTER SCREW W WASHER 57 M M20 3B M20 1B BRIDGE P S PACKING 2 REQ D 2 REQ D HOLDER NUT O RING M20 6B 2 REQ D M20 14B DRIVING BRIDGE ASSEMBLY M 20 1 8B POINTER ST...

Страница 12: ...8 825 734 442 640 10 169 7 117 3 5 194 218 15 97 1 4 20 1120 977 1067 927 245 258 1 7 25 2 1 30 282 296 2 4 35 40 2 8 l min 1215 1283 321 339 3 1 45 3 4 50 GPM PSI BAR TM 2020A DT PARALLEL LIMITED WA...

Отзывы: