Leofric Building Systems - Fairford Shed Instruction Manual
Page 7
With a
CHALK LINE
mark out the external size
of your shed ensuring that it is square, then apply
black Bitumen tape to the base just inside of the
CHALK LINE
, so you can still see the
CHALK
LINE
when your concrete panels are in position.
Step 1
Step 2
Starting in the
LEFT
hand
REAR CORNER
assemble your corner using the
HEEL AND TOE
method of assembling, assemble 3 panels either way loosely, then using a
SPIRIT LEVEL
upright your panel
and tighten the bolts ensuring that the tops are flush against each other.
Once you have done this continue with the rest of your building keeping it fairly even until all of your
concrete is assembled. Place your doors and windows in the required positions with the header panels fitted
above them.
Содержание FAIRFORD SHED
Страница 1: ...INSTRUCTION MANUAL FAIRFORD SHED ...