
Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
55
EDBPM−H310 DE/EN/FR 7.1
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
Stop!
Only connect PC and operating unit when the units are switched
off!
l
HMI Designer
LCD ADJ
+2
4
VDC
INPUT: 18 - 32 V 5W
FUSE
315 mA
0 VDC
N.C.
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
1 2 3
4
5
2
3
4
0
1
2
h310_005
Fig. 5−1
Connecting operating unit and PC
1. Plug the programming adapter EPZ−H111
onto the ASP8 interface.
2. Connect download cable EPZ−H110
to programming adapter
EPZ−H111
.
3. Plug download cable EPZ−H110
onto COM1 or COMx
at PC.