7
Commissioning
Before switching on
EDK82ZAFBC−001 DE/EN/FR 7.2
42
l
H1inbet−INB_01_warn
7
Commissioning
Before switching on
Commissioning depends on the device combination (bus−I/O and fieldbus function
module). The commissioning procedure is described in the documentation on the fieldbus
system and the frequency inverter.
Switch position
1
ON
2 3 4 5
ON
OFF
)
Note!
DIP switch and C0034 must be set for the same value range, otherwise the
analog input signal at X3/8 will be interpreted incorrectly by the standard
device.
If a setpoint potentiometer is internally supplied through X3/9, the DIP switch
must be set to a voltage range of 0 ... 5 V. Otherwise it is not possible to use the
whole speed range.
Signal at X3/8
Switch position
C0034
1
2
3
4
5
0 ... 5 V
OFF
OFF
ON
OFF
OFF
0
0 ... 10 V (Lenze setting)
OFF
OFF
ON
OFF
ON
0
0 ... 20 mA
OFF
OFF
ON
ON
OFF
0
4 ... 20 mA
OFF
OFF
ON
ON
OFF
1
4 ... 20 mA
Open−circuit
monitoring
OFF
OFF
ON
ON
OFF
3
−10 V ... +10 V
ON
ON
OFF
OFF
OFF
2