4
PowerStation LV200
The cross-section of the cables of the terminals C, D and E should
not be smaller than 26 AGW, for distances of 4m and longer we
recommend 24 AGW. The maximum cross- section for these
terminals is 16 AGW.
When you optionally connect terminal E of the LV200 with
terminal E of the LZ100 command station, the command station is
informed of the overloading of the power station. The command
station will then transfer this information to all input equipment
(manual control etc.) and turn off the DCC track signal to all other
power stations. The display of the LH100 will then inform you
regarding the switching-off of power or resuming operation.
If you do not connect terminal E of the LV200 with the LZ100
command station, then when an overload occurs, the LV200 only
shuts down the track area it is connected and the LZ100 will not
shut down any other power station on the layout. After a certain
time (when the LV200 power station has cooled down) the LV200
power station will switch on the current supply TO ITS TRACK
SECTION automatically. If the overloading still exists, THE LV200
will switch off again after a short period of time.
to LZ100
Tracks of the model railroad
Trafo 1
U V J K
L enz E lektr onik G mb H
D - 35 398 G IES S EN
Mad e in G erm any
I / O - Po rt
C D E
LV200
LZ100
UV R S PQ
L MA B
C D E
L enz Ele ktro nik Gm bH 353 98 G iesse n M ade in Ge rm any
XBUS
Connecting the LV200 to the command stationLZ100