Figure 120. Installing the top hinge bracket
After this task is completed
Proceed to “Fill the heat exchanger with water” on page 108.
Fill the heat exchanger with water
See this topic to learn how to fill ThinkSystem Rear Door Heat eXchanger V2 with water.
About this task
S038
CAUTION:
Eye protection should be worn for this procedure.
Attention:
Wear safety goggles or other eye protection whenever you fill, drain, or purge air or nitrogen from
the heat exchanger.
Procedure
Step 1. If the inner hose access panel is installed, lift and remove it from the heat exchanger.
108
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide
Содержание ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Страница 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Страница 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Страница 145: ...Figure 159 Installing a rear cable management bracket Chapter 5 Hardware removal installation and reversion 141 ...
Страница 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 153: ......
Страница 154: ......