
The following illustration shows how to install a blade server into a BladeCenter unit. The appearance of
your BladeCenter unit might be different; see the documentation for your BladeCenter unit for additional
information. To install a blade server in a BladeCenter unit, complete the following steps.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00
00
00
00
00
00
00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00
00
00
00
00
00
00
0
0
0
0
0
0
0
00
00
00
00
00
00
00
00
00
00
0
0
0
00
00
00
Statement 21
CAUTION:
Hazardous energy is present when the blade server is connected to the power source. Always replace
the blade cover before installing the blade server.
Step 1.
Before you begin, read “Safety” on page iii and “Installation guidelines” on page 17.
Step 2.
Select the blade bay for the blade server; at least one blade bay is required.
Notes:
1. When any blade server or device is in blade bay 7 through 14, power modules must be
installed in all four power-module bays. For additional information, see the
Installation and
User's Guide
that comes with the BladeCenter unit.
2. If you are reinstalling a blade server that you removed, you must install it in the same blade bay
from which you removed it. Some blade server configuration information and update options
are established according to blade server bay number. Reinstalling a blade server into a
different blade server bay number from the one which it was removed can have unintended
consequences, and you might have to reconfigure the blade server.
3. To help ensure proper cooling, performance, and system reliability, make sure that each blade
bay on the front of the BladeCenter unit contains a blade server, expansion unit, or blade filler.
Do not operate a BladeCenter unit for more than 1 minute without a blade server, expansion
unit, or blade filler in each blade bay.
Step 3.
Make sure that the release handles on the blade server are in the open position (perpendicular
to the blade server).
Attention:
Two people are required to install a Type 1911 blade server into the bay.
Statement 4: (for Type 1911)
49
Содержание BladeCenter HS22
Страница 1: ...BladeCenter HS22 Blade Server Installation and User s Guide Machine Types 7870 1936 1911 ...
Страница 26: ...16 BladeCenter HS22 Blade ServerInstallation and User s Guide ...
Страница 62: ...52 BladeCenter HS22 Blade ServerInstallation and User s Guide ...
Страница 82: ...72 BladeCenter HS22 Blade ServerInstallation and User s Guide ...
Страница 89: ...Taiwan Class A compliance statement Appendix B Notices 79 ...
Страница 90: ...80 BladeCenter HS22 Blade ServerInstallation and User s Guide ...
Страница 95: ......
Страница 96: ...Part Number 00D9283 Printed in China 1P P N 00D9283 1P00D9283 ...