Install the wall mount LED cable
See this topic to learn how to install the mount LED cable.
About this task
Watch the procedure.
A video of this procedure is available from the following link:
•
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DV_Ja2E7l6T-lwN_IrnJRk
Procedure
Step 1. Secure the LED panel to the OCP cage with two screws; then, bend the cable twice as illustrated,
secure the cable with the cable clips, and connect the cable to the system board.
Figure 181. Installing the wall mount LED cable.
After this task is completed
Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
Complete the parts replacement
Go through this checklist before completing parts replacement.
To complete parts replacement, go through the following list:
1. Ensure that all the removed components have been properly reinstalled and that no tools or loose
screws are left inside your server.
2. Properly route and secure the cables in the server. Refer to for each component that is installed.
3. If the top covers have been removed, reinstall it. See
“Install the top covers” on page 170
.
4. Reconnect external cables and power cords to the server.
174
ThinkEdge SE450 Maintenance Manual
Содержание 7D8T
Страница 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Страница 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Страница 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Страница 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Страница 72: ...Figure 43 EIA bracket regular depth Figure 44 EIA bracket maximal depth 64 ThinkEdge SE450 Maintenance Manual ...
Страница 75: ...Figure 47 Remove the mylar Figure 48 EIA bracket maximal depth Chapter 3 Hardware replacement procedures 67 ...
Страница 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Страница 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Страница 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Страница 217: ......
Страница 218: ......