“Installation Guidelines” on page 51
• For proper cooling and airflow, reinstall the air baffle before you turn on the server. Operating the server
with the air baffle removed might damage server components.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Align the air baffle hooks with the slots on the top of the fan cage; then, hook the air baffle onto the
slots.
Figure 54. Air baffle installation
After you finish
1. Install the top cover. See
“Install the top cover” on page 134
2. Complete the parts replacement. See
“Complete the parts replacement” on page 140
CMOS battery (CR2032) replacement
Use the following information to remove and install the CMOS battery.
Remove the CMOS battery (CR2032)
Use this information to remove the CMOS battery.
About this task
S002
.
Hardware replacement procedures
65
Содержание 7D7Q
Страница 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Страница 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 35: ...2 5 inch drive model Figure 26 Server components 2 5 inch drive model Chapter 2 Server components 27 ...
Страница 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 183: ......
Страница 184: ......