•
https://list.youku.com/albumlist/show/id_54461099
Procedure
Step 1. Install the PCIe riser assembly to zone 2.
Figure 81. Installing the PCIe riser assembly to zone 2
If a filler has been installed, remove it.
Align the PCIe riser assembly with the connector on the system board, and push it in.
Connect the PCIe cable to PCIe connector 5 on the processor and memory expansion tray.
After this task is completed
1. Reconnect all the required cables.
2. Proceed to complete the parts replacement (see “Complete the parts replacement” on page 218).
Power backplane replacement
Follow instructions in this section to remove or install the power backplane .
Remove the power backplane
Follow instructions in this section to remove the power backplane.
About this task
Attention:
.
Hardware replacement procedures
167
Содержание 7D31
Страница 1: ...ThinkSystem SR850 V2 Maintenance Manual Machine Types 7D31 and 7D32 ...
Страница 8: ...vi ThinkSystem SR850 V2 Maintenance Manual ...
Страница 52: ...44 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 60: ... Three backplanes on page 57 52 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 70: ...62 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 71: ...Chapter 3 Internal cable routing 63 ...
Страница 78: ...70 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 114: ...106 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 227: ...Figure 129 Installing the air baffle to the system board Chapter 4 Hardware replacement procedures 219 ...
Страница 236: ...Figure 133 System board and expansion board LEDs 228 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 258: ...250 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 260: ...252 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 264: ...256 ThinkSystem SR850 V2 Maintenance Manual ...
Страница 273: ......
Страница 274: ......