Attention - Drop hazard.
Complete the following steps to lift and move the cabinet to the designated site:
Step 1. Remove the four plugs from the four corners on the top of the cabinet frame.
Figure 9. Lifting the rack cabinet
Step 2. Install one M12 eye bolt to each hole, and make sure they stay solidly connected to the cabinet.
Step 3. Connect the four eye bolts to the hook of a crane lifter, and make sure the cord length allows an
angle more than 75˚.
Step 4. Lift the cabinet and place it to the designated site.
After moving the cabinet to the designated site, complete the following steps:
1. Make sure the leveling feet are down and make firm contact to the ground. If not, complete the following
procedure on each of the leveling feet.
a. Loosen the nut that fixes the leveling foot if necessary.
11
Содержание 7D2C
Страница 1: ...ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide Machine Type 7D2C and 7D2P ...
Страница 4: ...ii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 10: ...viii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 12: ...2 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 14: ...4 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 24: ...14 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 70: ...60 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Страница 71: ......
Страница 72: ...Part Number SP47A41857 Printed in China 1P P N SP47A41857 1PSP47A41857 ...