background image

15

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

If the vent system extends more than 5 feet 

(1.5m) above the roof flashing, stabilizers may 

be necessary. Additional screws may be used 

at section joints for added stability. Guide wires 

may be attached to the joint for additional sup-

port on multiple joint configurations.

G.

 

Continue installation of horizontal/inclined 

sections -

 Continue with the installation of the 

straight vent sections in horizontal/inclined run 

as described in 

Step C.

 Install support straps 

every 5 ft. (1.52 m) along horizontal/inclined 

vent runs using conventional plumber’s tape. 

See Page 18, Figure 28. It is very important 

that the horizontal/inclined run be maintained 

in a straight (no dips) and recommended to be 

in a slightly elevated plane, in a direction away 

from the fireplace of 1/4 " rise per foot (20 mm 

per meter) which is ideal, though rise per foot 

run ratios that are smaller are acceptable all the 

way down to at or near level.  Use a carpenter’s 

level to measure from a constant surface and 

adjust the support straps as necessary. 

It is important to maintain the required clear-

ances to combustibles: 1" (25 mm) at all sides 

for all vertical runs; and 3" (76 mm) at the 

top, 1" (25 mm) at sides, and 1" (25 mm) at 

the bottom for all horizontal/inclined runs.

H.

 

Frame roof opening -

 Identify location for 

vent at the roof. Cut and/or frame opening per 

Roof Framing Chart (Figure 22).

One method of support is by utilizing field pro-

vided support straps (conventional plumber’s 

tape).  Secure the plumber’s tape to the framing 

members with nails or screws. Loop the tape 

around the vent, securing the ends of the tape 

to the framing. If desired, sheet metal screws 

#6 x 1/2" length may be used to secure the sup

-

port straps to the vent pipe. Refer to Figure 20

F.

 

Change vent direction to horizontal/inclined 

run -

 At transition from or to a horizontal/in-

clined run, install the SV4.5E45 and SV4.5E90 

elbows in the same manner as the straight vent 

sections. The elbows feature a twist section to 

allow them to be routed about the center axis 

of their initial collar section to align with the 

required direction of the next vent run element. 

Twist elbow sections in a clockwise direction 

only so as to avoid the possibility of unlocking 

any of the previously connected vent sections 

(see Figure 21).

K. Install the vertical termination - 

The final 

step involves installation of the SV4.5CGV-1 

Vertical Termination.  Extend the vent sections 

to  the  height  as  shown  in  the  "Vertical  vent 

termination section" in 

Figure 5 on Page 6.  

The SV4.5CGV-1 Vertical Termination 

(Figure 

24) can be installed  in the exact same fashion 

as any other 

Secure Vent™

 section. Align the 

termination  over  the  end  of  the  previously 

installed section, adjusting the radial alignment 

until the four locking dimples of the termination 

are aligned with the inlets of the four incline 

channels of the last vent section.  Push the 

termination down until it fully engages, then 

twist  the  termination  clockwise  running  the 

dimples down and along the incline channels 

until they are seated at the end of the channels.

I.

 

Install the roof flashing - 

Extend the vent 

sections through the roof structure. Install the 

roof flashing over the vent section and posi-

tion such that the vent column rises vertically 

(use carpenters level) 

(Figure 23). Nail along 

perimeter to secure flashing or adjust roofing 

to overlap the flashing edges at top and sides 

only and trim where necessary. Seal the top 

and both sides of the flashing with waterproof 

caulking.

J.

 

Install the storm collar -

 Install the storm 

collar, supplied with the flashing, over the vent/

flashing joint (see Figure 23)Loosen the storm 

collar screw. Slide collar down until it meets 

the top of the flashing. Tighten the adjusting 

screw.  Apply  non-combustible  caulking  or 

mastic around the circumference of the joint 

to provide a water tight seal.

Figure 21

Swivel Joint

(360° swivel)

SV4.5E45

(45° Elbow)

Swivel Joint

(360° swivel)

SV4.5E90

(90° Elbow)

8-1/8"

(206 mm)

Framing Dimensions for Roof

Inches (millimeters)

Pitch

C

D

0/12

10-1/2 in.

(267 mm)

10-1/2 in.

(267 mm)

6/12

10-1/2 in.

(267 mm)

12 in.

(305 mm)

12/12

10-1/2 in.

(267 mm)

17 3/4 in.

(451 mm)

C

D

Figure 22 - Roof Framing

Figure 23

Figure 24

4-13/16"

(122 mm)

Storm

Collar

Flashing

LENNOX HEARTH PRODUCTS  •  MERIT

® 

 SERIES DIRECT-VENT GAS FIREPLACES  •  MODELS MLDVT-30/35/40/45  •  INSTALLATION INSTRUCTIONS

Содержание Meris SeriesM LDVT-45NE

Страница 1: ...T AVISO HOT GLASS WILL CAUSE BURNS DO NOT TOUCH GLASS UNTIL COOLED NEVER ALLOW CHILDREN TO TOUCH GLASS UNE SURFACE VITR E CHAUDE PEUT CAUSER DES BR LURES LAISSER REFROIDIR LA SURFACE VITR E AVANT D Y...

Страница 2: ...lation The Electronic appliances have an electronic intermittent pilot ignition system External electrical power is required to operate these units The battery back up can be used in case of a power o...

Страница 3: ...lation de cet appareil These appliances comply with National Safety Standards and are tested and listed by ETL Intertek Report No 100326540PRT 001 to ANSI Z21 88 in Canada CSA 2 33 and CAN CGA 2 17 M9...

Страница 4: ...jurisdiction and by the USA National Fuel Gas Code NFPA 54 ANSI Z223 1 latest edition or in Canada the CAN CSA B149 1 codes latest edition Installtheapplianceaccordingtotheregulations of the local au...

Страница 5: ...le etc a metal or woodbarriercoveringtheentirebottomsurface must be used Cold Climate Insulation For cold climate installations seal all cracks around your appliance with noncombustible material and w...

Страница 6: ...6 12 to 7 12 1 25 0 38 7 12 to 8 12 1 5 0 46 8 12 to 9 12 2 0 0 61 9 12 to 10 12 2 5 0 76 10 12 to 11 12 3 25 0 99 11 12 to 12 12 4 0 1 22 12 12 to 14 12 5 0 1 52 14 12 to 16 12 6 0 1 83 16 12 to 18 1...

Страница 7: ...e t e m t e e f 5 1 f o t h g i e h a n i h t i w m c 1 9 t e e f 3 y l b m e s s a r o t a l u g e r r e t e m e h t e v o b a t e e f 5 1 f o t h g i e h a n i h t i w m c 1 9 t e e f 3 y l b m e s...

Страница 8: ...ment door Any hearth extension used is for appearance only and does not have to conform to standard hearth extension installation requirements ShelfHeight Toprovideforthelowestpossibleshelfsurface the...

Страница 9: ...eir equivalent Unit Being Secured by its Nailing Flanges to the Framing Left Side Front Corner of Fireplace Shown Right side requirements are the same NOTE The nailing flanges combustible mem bers and...

Страница 10: ...Dimensions Model No A B C D MLDVT 30 in 30 1 4 35 1 4 39 1 4 16 mm 768 895 997 406 MLDVT 35 in 35 1 4 35 1 4 39 1 4 16 mm 895 895 997 406 MLDVT 40 in 40 1 4 40 1 4 44 1 4 16 mm 1022 1022 1124 406 MLD...

Страница 11: ...nts outlined in the National Fuel Gas Code NFPA 54 latest edition USA or CAN CSA B149 1 latest edition Canada Also see Figure 13 Figure 15 Route Gas Line 3 76 mm Left Side Front Corner of Fireplace Fr...

Страница 12: ...u foumisseunde gaz Useonlyapprovedventingcomponents See Approved Vent Components on Page 2 These fireplaces must be vented directly to the outside The vent system may not service multiple appliances a...

Страница 13: ...4 1 1 3 5 5 2 4 4 0 2 2 0 1 1 5 1 5 8 3 5 5 7 8 4 4 1 0 0 2 1 1 4 1 9 4 5 5 7 5 4 1 0 2 1 1 1 5 1 8 5 5 5 6 4 0 0 0 0 2 1 2 1 5 2 6 5 5 7 8 6 4 1 0 0 0 2 1 3 1 5 8 6 5 5 7 3 7 4 0 1 0 0 2 1 3 1 3 7 5...

Страница 14: ...nal specifications Where required a telescopic vent section SV4 5LA may be used to provide the installer withanoptionininstallingintightand confined spaces or where the vent run made up of fixed lengt...

Страница 15: ...align with the required direction of the next vent run element Twist elbow sections in a clockwise direction onlysoastoavoidthepossibilityofunlocking any of the previously connected vent sections see...

Страница 16: ...all the way down to at or near level SV4 5VF Secure Vent SF4 5VF Secure Flex firestop spacer must be used anytime vent pipe passes through a combustible floor or ceiling SV4 5HF Secure Vent SF4 5HF S...

Страница 17: ...op Vent three elbows LENNOX HEARTH PRODUCTS MERIT SERIES DIRECT VENT GAS FIREPLACES MODELS MLDVT 30 35 40 45 INSTALLATION INSTRUCTIONS VERTICAL VENT FIGURES TABLES continued Horizontal Outside Wall Te...

Страница 18: ...vent run element Twist elbow sections in a clockwise direction only so as to avoid the possibility of unlocking any ofthepreviouslyconnectedventsections see Figure 19 on Page 14 I Continue installatio...

Страница 19: ...ng the use of the fireplace Young children should be carefully supervised when they are in the same area as a hot termination To prevent contact with hot surfaces we recommend the use of a Termination...

Страница 20: ...NENT IN THE SYSTEM see Figure 31 Use Table 8 as an aid in venting component selection for a particular range of exterior wall thicknesses Figure 32 Top Vent ONE 90 DEGREE ELBOW ELBOW CONNECTION NOT DI...

Страница 21: ...HEARTH PRODUCTS MERIT SERIES DIRECT VENT GAS FIREPLACES MODELS MLDVT 30 35 40 45 INSTALLATION INSTRUCTIONS See Table 8 on Page 20 as an aid in venting component selection for a particular range of ext...

Страница 22: ...g Firestop Spacer SV4 5VF When using Secure FlexTM use Firestop Spacer SF4 5VF When using Secure Flex use Firestop Spacer SF4 5HF Wall Firestop Spacer SV4 5HF See Table 8 on Page 20 as anaidinventingc...

Страница 23: ...proximately 1 2 inch from the end 3 Pull and extend the inner flexible vent pipe 4 Slidetheinnerflexpipeovertheadaptorcol lar Ensure the flexible vent pipe completely engages the adaptor collar to a d...

Страница 24: ...TP TH TP IN ORANGE THTP BLACK TP GREEN TH TO WALL SWITCH OR THERMOSTAT Refer to Section A for millivolt appliances and Section B for electronic appliances The gas valve is set in place and pre wired a...

Страница 25: ...itch to the OFF position 10 After the wiring is complete replace the cover plate Note No batteries to be installed in the battery holderuntilapoweroutage oriftheapplianceis to be operated solely with...

Страница 26: ...ff valve and gas lex line and pull the assembly forward out of the compart ment Separate the shut off valve from the gas flex line Determine the length of pipe needed to route the gas line from the la...

Страница 27: ...he pilot lighting instructions provided in the Care and Operation Instructions manual For piezo igniter location see Figure 41 on Page 26 millivolt appliances only Note Lighting Instructions are also...

Страница 28: ...he rear log 1 as shown Position it on the left rear log bracket 2 Place the left front log 2 as shown Posi tion it against the left front of the log rack 3 Place the right front log 3 as shown Posi ti...

Страница 29: ...35 H7666 Left Rear Log Bracket Right Rear Log Bracket Glowing Embers Do not place glowing ember over burner slots Log Rack Volcanic Stone 4 5 3 2 1 2 3 1 Position on the left rear log bracket Right Re...

Страница 30: ...g bracket 4 2 3 Position the left front log 2 and the right front log 3 against the log rack 3 2 Log Number Description 1 Rear Log 2 Left Front Log 3 Right Front Log 4 Left Cross Log 5 Right Cross Log...

Страница 31: ...hannel above the door Pull the door forward 4 Retrieve the glass door Visually inspect the gasket on the backside of the frame Gasket surface must be clean free of irregularities and seated firmly 5 I...

Страница 32: ...HEARTH PRODUCTS MERIT SERIES DIRECT VENT GAS FIREPLACES MODELS MLDVT 30 35 40 45 INSTALLATION INSTRUCTIONS 1 Locateadjustmentrodandadjustairshutter to the standard setting as shown in Figure 50 adjust...

Страница 33: ...ng flush with the finished wall position framework to accommodate the thickness of the finished wall Figure 53 See Page 5 for Cold Climate Insulation and Page 8 for Clearances Top of Appliance 3 76 mm...

Страница 34: ...estas instrucciones y prosiga de la siguiente manera 1 Identifique el interruptor o el termostato de pared quecontrolalachimenea verifiquequeelinterruptor opera la chimenea encendi ndola y apag ndola...

Страница 35: ...V4 5VF 10 Firestop Spacer Vertical rigid 1 1 1 spacing 10 pack 96K92 SV4 5SP Support Plate LENNOX HEARTH PRODUCTS MERIT SERIES DIRECT VENT GAS FIREPLACES MODELS MLDVT 30 35 40 45 INSTALLATION INSTRUCT...

Страница 36: ...in 190 5 mm for flex 6 pack H7748 FVK36 36 Flex Connector Kit Note Flex attaches to appliance collar at one end and to rigid venting at other end Listed Secure Vent Components Cat Model Description 1...

Страница 37: ...e front glass door assembly See Figure 49 on Page 31 Step 3 Carefully remove the logs Take care not to break the logs Step 4 Refer to Figure 55 on Page 38 Remove the burner assembly with attached vent...

Страница 38: ...sure regulator and diaphragm Discard allremovedcomponents Ensuretheprovided diaphragm is installed properly onto the replacement pressure regulator and install the new pressure regulator using the new...

Страница 39: ...the orifice with the one provided with the kit Exercise extreme care to prevent damagetoorbreakageoftheigniterassembly All Models Step 9 Refer to Figure 55 on Page 38 and Figure 60 VERIFY THE PROPER O...

Страница 40: ...time without notice in design materials specifications prices and also to discontinue colors styles and products Consult your local distributor for fireplace code information 1508 Elm Hill Pike Suite...