background image

Page 2

FIGURE 1

ZG 036-060 UNITS

REMOVE

PANELS

REMOVE

HEAT CONTROL

ACCESS PANEL

CAUTION

Danger of sharp metallic edges. Can cause injury.
Take care and wear protective clothing when
servicing unit to avoid accidental contact with
sharp edges.

IMPORTANT-The gas supply shall be shut off prior to
disconnecting the electrical power, before proceeding
with this conversion.

3- Remove and retain four screws securing manifold to

burner box; remove manifold. See figure 2, 3, or 4.

4- Remove orifices from manifold and install the orifices

provided in kit. Unit will have 3, 5, or 7 burners.
Replace only the orifices which have a burner
installed.

On four-stage units only, the two left orifices are
0.050”: and the right five orifices are 0.052”. See
figure 4 for proper orifice placement.

CAUTION - Tighten orifices with pipe threads to 6.25

ft.lbs. Do not overtighten.

IMPORTANT - Do not use thread compound on gas orifices.

5- Replace the manifold and secure with retained

screws.

6- Install spring kit as shown in figure 5 for

single-stage gas valves, figure 6 for two-stage and
four-stage White Rodgers gas valves, and figure 7
for two-stage Honeywell gas valves. Also refer to
the manufacturer's instructions provided with
spring kit. When installing 14N21 kit, discard the
unused spring kit.

FIGURE 2

BURNER BOX ASSEMBLY - ZG 036-060

ORIFICES

(3, 5, OR 7)

Remove and retain two

screws on each side;

remove manifold.

GAS

VALVE

GAS

MANIFOLD

BURNERS

Отзывы: