background image

Page 8

Check−Out Procedure

Connect jumpers or toggle switches between the DDC out-
put terminals to simulate a thermostat demand and con-
firm proper unit operation. See figure 16. Refer to unit
installation instruction and Prodigy Control manual pro-
vided with unit.

1. Disconnect 24V power connector 

on DDC.

2. Use Prodigy Control manual to troubleshoot and/or

clear any errors codes from the Prodigy Control main
board readout.

3. Install a jumper wire across fan output terminals C and

NO.

4. Apply power to unit; blower will operate. Leave blower

jumper in place throughout check−out.

5. Manually activate stages of heating and cooling with

a jumper connection between terminal NO and C as
follows:

HEAT 1

First−stage heating

HEAT 2

Second−stage heating

COOL 1

First−stage cooling

COOL 2

Second−stage cooling

DAMPER

Economizer

The corresponding indicating light on the A55 M2 main
control board should turn on. This indicates that the Prodi-
gy Control board is receiving a demand from the DDC. This
also indicates that wiring between the DDC output terminal
block and the Prodigy Control input terminal is correct for
each function.

IMPORTANT

Do not jumper cooling and heating outputs at the
same time.

6. Turn off power.
7. Remove all jumpers or toggle switches.

IMPORTANT − All field installed jumpers or toggle
switches should be removed after service has been
completed to ensure that unit control has been
switched back to the DDC.

8. Connect 24V power connector to DDC.
9. Restore power to unit. Check the SERVICE LED −

Flashing or steady-ON indicates replace board; OFF
indicates board OK.

10. Repeat check−out procedure if needed.

CAUTION:

REMOVE 24V

POWER

CONNECTOR

BEFORE UNIT

CHECK−OUT

JUMPER

ACROSS FAN

TERMINALS

C & NO

JUMPER

TERMINALS

C & NO TO
ACTIVAGE

STAGES − DO

NOT JUMPER

HEAT & COOL

AT SAME TIME!

COOL

2

DAMPER

(ECONOMIZER)

COOL

1

HEAT

2

HEAT

1

FAN

SERVICE LED

Figure 14. Danfoss RTC

Отзывы: