background image

14

9 - GAS SUPPLY PIPING

CAUTION

WHAT TO DO IF YOU SMELL GAS

• Do not try to light any appliance.
• Do not touch any electrical switch; do not use 

any phone in your building.

• Immediately call your gas supplier from a 

neighbor’s phone.  Follow gas supplier’s 

instructions. 

• If you cannot reach your gas supplier, call the 

fi

 re 

department.

!

!

  

CHECK GAS SUPPLY

Gas pipe to your boiler must be correct size for 

length of run and for total BTU per hour input of all 

gas utilization equipment connected to it. See Table 

5 for proper size. Be sure your gas line complies with 

local codes and gas company requirements.

CONNECTING THE GAS PIPING See Figure 11.

Gas line enters boiler from right side.

• Use piping materials and joining methods acceptable 

to authority having jurisdiction.  In absence of such 

requirements:

• USA - National Fuel gas Code, ANSI Z223.1/NFPA 54
• Canada - Natural Gas and Propane Installation Code, 

CAN/CSA B149.1

•  Use pipe joint compound suitable for LP gas on male 

threads only.

•  Use ground joint unions.
•  Install sediment trap upstream of gas controls.
•  Use two pipe wrenches when making connection to gas 

valve to keep it from turning.

•  Install manual shut-off valve in vertical pipe about 5 

feet above 

fl

 oor.

•  Tighten all joints securely.
•  Propane gas connections should only be made by 

licensed propane installer.

•  Two-stage regulation should be used by propane 

installer.

•  Propane gas piping should be checked out by propane 

installer.

CHECKING GAS PIPING

DANGER

Fire Hazard.  Do not use matches, candles, open 

fl

 ames, or other methods providing ignition source. 

Failure to comply will result in death or serious 

injury.

!

  

Pressure test boiler and gas connection before placing 

boiler in operation.

•  Pressure test over 1/2 psig (3.5 kPa).  Disconnect 

boiler and its individual gas shutoff valve from gas 

supply system.

•  Pressure test at 1/2 psig (3.5 kPa) or less.  Isolate 

boiler from gas supply system by closing manual gas 

shutoff valve.

•  Locate leakage using gas detector, noncorrosive 

detection 

fl

 uid, or other leak detection method 

acceptable to authority having jurisdiction.  Do 

not use matches, candles, open 

fl

 ames, or other 

methods providing ignition source.

•  Correct leaks immediately and retest.

NATURAL GAS

Pipe Capacity - BTU Per Hour Input 

Includes Fittings

Length of 

Pipe - FT

½”

¾”

1”

1¼”

20

92,000

190,000

350,000

625,000

40

63,000

130,000

245,000

445,000

60

50,000

105,000

195,000

365,000

PROPANE GAS

Pipe Capacity - BTU Per Hour Input 

Includes Fittings

Length of 

Pipe - FT

Copper Tubing *

Iron Pipe

¾”

½”

¾”

20

131,000

216,000

189,000

393,000

40

90,000

145,000

129,000

267,000

60

72,000

121,000

103,000

217,000

* Outside diameter

  Measure length of pipe or tubing from gas meter or 

propane second stage regulator.

Table 5 - Gas Pipe Sizes

Figure 11 - Gas Piping

Содержание GWB8-245E-2

Страница 1: ...rds Association for use with Natural and Propane Gases They are constructed and hydrostatically tested for maximum working pressure of 50 psi pounds per square inch in accordance with A S M E American...

Страница 2: ...1 DIMENSIONS Table 1 Dimensions BOILER MODEL NUMBER DIMENSIONS INCH FLUE DIAMETER A WIDTH GWB8 245E 2 GWB8 262E 2 7 27 GWB8 280E 2 GWB8 299E 2 7 30 Add 5 to height for vent Damper Figure 1 Dimensions...

Страница 3: ...requirements such as intermittent system operation extensive piping systems etc 3 Mbh 1 000 Btuh British Thermal Unit Per Hour Ratings marked Net AHRI Ratings indicate amount of remaining heat input...

Страница 4: ...Read this manual and understand all requirements before beginning installation SAFETY SYMBOLS WARNINGS The following defined symbols are used throughout this manual to notify the reader of potential...

Страница 5: ...2 Where required by the authority having jurisdiction the installation must conform to the Standard for Controls and Safety Devices for Automatically fired Boilers ANSI ASME CSD 1 3 Boiler series is...

Страница 6: ...cted indoor spaces All Outdoor Air Provide permanent opening s communicating directly or by ducts with outdoors A Two Permanent Opening Method Provide opening commencing within 12 inches of top and se...

Страница 7: ...of the relief valve outlet over the entire length of discharge line have no intervening shutoff valve between safety relief valve and discharge to atmosphere do not plug or place any obstruction in di...

Страница 8: ...e 10 Significant condensation may form in boiler and or venting system if boiler is operated for long period of time with return temperatures of less than 120 F Condensate is corrosive and can cause s...

Страница 9: ...9 Figure 5 Chilled Water Piping Figure 4 Typical Hot Water Piping 6 CONNECTING SUPPLY AND RETURN PIPING...

Страница 10: ...10 Figure 6 BYPASS PIPING CIRCULATOR ON SUPPLY Figure 7 BYPASS PIPING CIRCULATOR ON RETURN Bypass Piping Required For High Mass Large Water Content Systems 6 CONNECTING SUPPLY AND RETURN PIPING...

Страница 11: ...ugged by using plug supplied with vent damper 1 Position furnished vent damper on top of flue outlet collar Fasten damper securely to flue outlet collar with sheet metal screws Verify damper blade has...

Страница 12: ...fireplace dampers 4 Place in operation the appliance being inspected Follow the lighting instructions Adjust thermostat so appliance will operate continuously 7 CHIMNEY AND VENT PIPE CONNECTION 5 Tes...

Страница 13: ...r indicator points to open position Turn thermostat or controller down again and check damper position indicator returns to closed position Vent Damper Manual Operation Vent damper may be placed in op...

Страница 14: ...ld only be made by licensed propane installer Two stage regulation should be used by propane installer Propane gas piping should be checked out by propane installer CHECKING GAS PIPING DANGER Fire Haz...

Страница 15: ...y drafts hot or cold pipes sunlight lighting fixtures televisions a fireplace or a chimney 4 Check thermostat operation by raising and lowering thermostat setting as required to start and stop the bur...

Страница 16: ...ntegrated High Limit Electronic Ignition Control 240008781 I Inducer is not an option WARNING Modification substitution or elimination of factory equipped supplied or specified components may result i...

Страница 17: ...17 11 WIRING DIAGRAMS Figure 13 Integrated High Limit Electronic Ignition Control 240008781...

Страница 18: ...18 11 WIRING DIAGRAMS Figure 14 Integrated High Limit Electronic Ignition Control 240008781...

Страница 19: ...repeat this process Repeat until you have covered every radiation units in the system ending up at highest unit in system If your units have automatic vents manual venting is unnecessary but it will...

Страница 20: ...rol knob slightly and turn clockwise to OFF Do not force WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life...

Страница 21: ...y turning thermostat to lowest setting for one minute then back to normal setting ADJUST PILOT BURNER Pilot flame should surround 3 8 to 1 2 of the pilot sensor See Figure 16 If flame needs adjusting...

Страница 22: ...degrees C After setting limit control to limit setting check to see if it shuts off gas supply to burners Turn your thermostat up to call for heat and let boiler run until temperature of water reache...

Страница 23: ...T PIPE Venting and piping should be checked at least once a season If vent piping shows any sign of leaking replace immediately WATER SYSTEM If system is to remain out of service during freezing weath...

Страница 24: ...inals and wire joints Rollout switch blown Have your service agent check heat exchanged for blockage Replace rollout switch with exact replacement Blocked vent blown Have your service agent check vent...

Страница 25: ...nstalled in supply line It will eliminate air from water before it reaches radiators and bleed off this air MAIN AIR VENT FOR DOWN FLOW SYSTEMS OR DIAPHRAGM TYPE EXPANSION TANK Before system is filled...

Страница 26: ...ed vent safety switch must be reset manually after switch has cooled off by pushing reset button down Check venting system and chimney for blockage when restoring system to operating condition DO NOT...

Страница 27: ...sit Check sensing bulb is fully inserted in well and is not loose Refer to enclosed addendum for wiring instructions when using indirect hot water heater A 3 Adjusting Settings To discourage unauthori...

Страница 28: ...retry Flame signal was lost during state 7 or 8 and delay is called before retry 32 second delay 13 Soft lock out Soft lockout duration is one hour may override with manual reset 14 Hard lock out Man...

Страница 29: ...and display On retry models wait for retry or reset at thermostat Check for correct installation and wiring before replacing any component Control module cannot be repaired If it malfunctions it must...

Страница 30: ...umber of retries exceeded Soft lockout Soft lockout is reset after one hour if alarm reason disappears 63 Soft lockout maximum number of recycles exceeded Soft lockout 64 Soft Lockout electronics fail...

Страница 31: ...nnections are clean and tight Replace damaged wire Check for cracked ceramic insulator which can cause short to ground and replace igniter sensor if necessary At gas valve disconnect main valve wire f...

Страница 32: ...PRODUCT LITERATURE Lennox Industries Inc Dallas Texas Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: