Lennox ELITE TM-4500 Скачать руководство пользователя страница 7

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

7

Note:  The framed depth, 28

 ¹⁵⁄₁₆

" (735mm) from

a framed wall, must always be measured from a
finished surface. If a wall covering such as drywall
is to be attached to the rear wall, then the framed
depth must be measured from the drywall sur-
face. It is important that this dimension be exact.

If the appliance is to be elevated above floor level,
a solid continuous platform must be constructed.

The header may rest on the top metal spacers,
but must not be notched to fit around them.

Consult all local codes.

Figure 12

Figure 13

A

 48 

¹¹⁄₁₆

"

(1237 mm)

B

1

47 

¹⁄₄

"

(1200 mm)

B

2

66 

¹⁄₂

"

(1689 mm)

C

 38 

⁷⁄₈

"

(987 mm)

D

20 

⁷⁄₁₆

"

(519 mm)

E

96 

³⁄₄

"

(2457 mm)

F

48 

³⁄₈

"

(1229 mm)

G

 28 

¹⁵⁄₁₆

"

 (735 mm)

J

17 

¹⁄₂

"

(445 mm)

K

68 

³⁄₈

"

(1737 mm)

Framing Dimensions

Figure 16

Flue Type

A

B

FTF10

19"

19"

Vertical

(483 mm)

(483 mm)

FTF10 30

°

19"

29"

Offset

(483 mm)

(737 mm)

Framing Dimensions for Ceiling

Figure 14

Figure 15

Pitch

C

D*

0/12

19"

19"

(483 mm)

(483 mm)

6/12

19"

22"

(483 mm)

(559 mm)

12/12

 19"

 27"

(483 mm)

(686 mm)

*Perpendicular to roof ridge

Figure 17

Framing Dimensions for Roof

A

B

1

B

2

Header

False Header

Fireplace Framing

FOAK-4 Combustion

Air Kit

G

A

J

Outside Chase

Back Wall of Chase/Enclosure

Including Finishing Materials

if any

Rough Framing Face
(Unfinished Shown)

A

B

Ceiling Framing

C

D

Roof Framing

G

A

FOAK-4

Inside Chase

Back Wall of Chase/Enclosure

Including Finishing Materials

if any

Rough Framing Face
(Unfinished Shown)

Note:  All framing dimensions calcu-
lated for 5/8" nailing flange depth and
1/2" dry wall at the fireplace face.  If
sheathing the chase or finishing with
other thickness materials, calculations
will  need to be made.

Note:  C and G dimensions include 1"
clearance to combustibles.

A

E

F

D

C

K

FOAK-4

Back Wall of
Chase/Enclosure
Including Finishing
Materials if any

Rough

Framing Face

(Unfinished Shown)

Corner Installation

C

Содержание ELITE TM-4500

Страница 1: ...beginning your installation Do not alter or modify the fireplace or its components under any circumstances Any modification or alteration of the fireplace system including but not limited to the firep...

Страница 2: ...inspected by your distributor or qualified factory representative to ensure safe condition When in doubt con sult your distributor 16 For additional safety considerations and complete operating instr...

Страница 3: ...omesandbuildingsof conventionalconstruction notinmobilehomes These fireplace systems are designed for in stallation in accordance with the National Fire Protection Standard for chimneys fireplaces and...

Страница 4: ...on Note Non Combustible Chase Flashing Must be Used to Cover Chase Opening Optional Insulation in Outside Walls of Chase Solid Continuous Surface Outside Base Insulation Thermal Barrier 8 2 4m Level H...

Страница 5: ...sually no special floor support is needed for the fireplace however to be certain 1 Estimate the total weight of the fireplace system including chimney and surround ma terials such as brick stone etc...

Страница 6: ...BY THEM Step 4 Fireplace may be anchored to floor Bend down four 4 anchor tabs located at the base of the fireplace and secure to the floor by nailing with 8d nails Figure 10 Note The Z type safety st...

Страница 7: ...m Framing Dimensions for Ceiling Figure 14 Figure 15 Pitch C D 0 12 19 19 483 mm 483 mm 6 12 19 22 483 mm 559 mm 12 12 19 27 483 mm 686 mm Perpendicular to roof ridge Figure 17 Framing Dimensions for...

Страница 8: ...ir duct must never terminate higher than the chimney Step 9 Cut or frame hole through the outside wall for the installation of the duct inlet hood A 4 114 mm diameter hole is sufficient Feed the loose...

Страница 9: ...the roof flashing openings Figure 26 Always maintain 2 minimum air space to com bustiblematerialsandalwayscheckeachchim ney joint inner and outer to ensure proper engagement Checkverticalalignmentofc...

Страница 10: ...rust preventative paint designed for metal This is especially important when installationsaremadeinabnormallyadverseor corrosive environments such as near lakes oceans or in areas with consistently hi...

Страница 11: ...sfromtotaldesiredheight Reference Vertical Elevation Chart and deter minethenumberofchimneysections quantity and length required SPECIAL OFFSET INSTRUCTIONS To clear any overhead obstructions you may...

Страница 12: ...3 Use Elevation Chart as job estimator only Add necessary firestop spacers and sta bilizers as required Firestop spacers must be used as shown in Figures 21 and 22 and stabilizers as shown in Figure...

Страница 13: ...171 14 3 0 0 5 182 15 2 1 0 5 188 15 8 0 1 5 192 16 0 2 0 5 198 16 6 1 1 5 206 17 2 0 0 6 215 17 11 1 0 6 222 18 6 0 1 6 226 18 10 2 0 6 232 19 4 1 1 6 240 20 0 0 0 7 250 20 10 1 0 7 256 21 4 0 1 7 FT...

Страница 14: ...install the same way as round terminations and stabilizers Step 1 Hold return elbow over top of last chimney section Step 2 Center inner slip section into inner flue pipe slip down Step3 Centerouter...

Страница 15: ...key for safety Always plumb gas line installation per local codes Check all connections and test for gas leaks using a gas leak test solution also referred to as bubble leak solution Note Using a soap...

Страница 16: ...om the fireplace opening If fireplace is installed diagonally across a 90 corner no wall shields are required Fireplace Opening Typical Installation 6 167mm 12 305mm Min Combustible Mantel and Trim Sp...

Страница 17: ...ultered Stone Hearth stone 2 82 355 3 36 3 3 8 Wonderboard 3 23 31 3 85 3 7 8 Super Firetemp M Johns Manville 61 1 64 73 3 4 Super Firetemp L Johns Manville 54 1 85 64 5 8 Face brick 9 00 111 10 71 10...

Страница 18: ...inations If you encounter any problems or have ques tions concerning the installation or application of this system please contact your distributor For the name of your nearest distributor call LENNOX...

Страница 19: ...2 Firestop Spacer Flat 63L36 F10FS 2 Chase Termination Square 63L52 FTF10 CT2RS INSTALLATION COMPONENTS Firestop Spacer 30 63L37 F10FS30 2 Round Termination 63L55 FTF10 CTDTM Termination Shroud 63L56...

Страница 20: ...at any time without notice in design materials specifications prices and also to discontinue colors styles and products Consult your local distributor for fireplace code information Printed in U S A 2...

Отзывы: