Page 22
1
2
3
TJERNLUND HORIZONTAL VENTING SYSTEM (SIDESHOT) OPERATION SEQUENCE
:
1 When 1K2 closes, 120VAC is routed through the relay/timer, electronic ignitor (A73), and the limit switch.
2 The relay/timer energizes the venter motor.
3 After the venter motor establishes a draft, the N.O. fan proving switch closes completing the circuit to the burner
motor.