background image

Page 30

 Applications Using A Single-Stage Thermostat

See figure 24 for ignition control sequence

B - Heating Sequence -- Integrated Control Thermostat
Selection DIP Switch 1 ON in “Single-Stage”  Position

NOTE - In these applications, two-stage heat will be initi­
ated by the integrated control if heating demand has not
been satisfied after the field adjustable period (7 or 12 min­
utes).

 1. On a call for heat, thermostat first-stage contacts close

sending a signal to the integrated control. The inte­
grated control runs a self‐diagnostic program and
checks high temperature limit switches for normally
closed contacts and pressure switches for normally
open contacts. The combustion air inducer is ener­
gized at low speed.

 2. Once the control receives a signal that the low pres­

sure switch has closed, the combustion air inducer be­
gins a 15-second pre-purge in low speed.

NOTE - If the low fire pressure switch does not close
the combustion air inducer will switch to high fire. After
a 15 second pre-purge the high fire pressure switch
will close and the unit will begin operation on high fire.
After 10 to 20 seconds of high fire operation the unit
will switch to low fire.

 3. After the pre-purge is complete, a 20-second initial ig­

nitor warm-up period begins. The combustion air in­
ducer continues to operate at low speed.

 4 - After the 20-second warm-up period has ended, the gas

valve is energized on low fire (first stage) and ignition oc­
curs. At the same time, the control module sends a sig­
nal to begin an indoor blower 30-second ON-delay.
When the delay ends, the indoor blower motor is ener­
gized on the low fire heating speed and the HUM con­
tacts are energized. The integrated control also initi­
ates a second-stage on delay (factory-set at 7 min­
utes; adjustable to 12 minutes).

 5 - If the heating demand continues beyond the second-

stage on delay, the integrated control energizes the
combustion air inducer at high speed. The control also
checks the high fire (second stage) pressure switch to
make sure it is closed. The high fire (second stage)
gas valve is energized and the indoor blower motor is
energized for operation at the high fire heating speed.

 6 - When the thermostat heating demand is satisfied, the

combustion air inducer begins a 5-second low speed
post-purge.  The field-selected indoor blower off delay
begins. The indoor blower operates at the low-fire
heating speed.

 7 - When the combustion air post-purge period is com­

plete, the inducer and the HUM contacts are de-ener­
gized. The indoor blower is de-energized at the end of
the off delay as well as the 120V ACC terminal.

1 stg heat demand

2 stg heat demand

15

ON

OFF

ÉÉ

ÉÉ

low speed CAI

35

1

Pre-Purge

Ignitor Warm-up

30 second

blower

“on” delay

Post

 Purge

5 SEC

80

ignitor

HEATING OPERATION WITH TWO-STAGE THERMOSTAT

low fire gas valve

indoor blower low heat

high speed CAI
high fire gas valve

indoor blower high heat

39

Trial For
Ignition

blower

“off”

delay

 RECOGNITION PERIOD

30 seconds

FIGURE 23

heat demand

15

ON

OFF

ÉÉ

ÉÉ

low speed CAI

35

1

Pre-Purge

Ignitor Warm-up

30 second

blower

“on” delay

Post

 Purge

5 SEC

80

ignitor

HEATING OPERATION WITH SINGLE STAGE THERMOSTAT

low fire gas valve

indoor blower low heat

high speed CAI
high fire gas valve

indoor blower high heat

39

Trial For
Ignition

blower

“off”

delay

7 or 12 minutes after heating demand begins, furnace switches to high fire (depending on setting)

FIGURE 24

Содержание EL280DFE Series

Страница 1: ...xcept where noted are recommendations only and do not consti tute code TABLE OF CONTENTS Specifications Page 2 Blower Performance Data Page 3 Parts Identification Page 4 I Unit Components Page 5 II In...

Страница 2: ...g 2 3 5 3 4 Air Volume Range cfm 400 1475 780 1700 Electrical Data Voltage 120 volts 60 hertz 1 phase Blower motor full load amps 6 1 8 2 Maximum overcurrent protection 15 15 Shipping Data lbs 1 packa...

Страница 3: ...02 0 70 1405 482 1235 365 1075 295 990 259 840 209 0 80 1160 369 1025 308 925 268 780 217 EL280DF070E36A PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Blower Spee...

Страница 4: ...ION Control Box includes integrated control transformer and door switch Secondary Limit Internal Flue Pipe Assembly Gas Valve Burner Box Assembly Combustion Air Inducer Indoor Blower Heat Exchanger Pr...

Страница 5: ...nits are equipped with the SureLight two stage inte grated control The system consists of a ignition blower control figures 4 and 5 with control pin designations in tables 1 and 2 and ignitor The cont...

Страница 6: ...he DIP switch to ON for use with a single stage thermostat While in the single stage thermostat mode the burners will always fire on first stage heat The combustion air inducer will operate on low spe...

Страница 7: ...T STAGE COOL SIGNAL Y2 THERMOSTAT 2ND STAGE COOL SIGNAL O THERMOSTAT SIGNAL TO HEAT PUMP REVERSING VALVE L NOT USED DH NOT USED HUM UNPOWERED NORMALLY OPEN DRY CONTACTS LI 120 VAC INPUT TO CONTROL ACC...

Страница 8: ...ELECTION 1 2 3 4 5 6 ON SureLight W1W2 G Y2 Y1 C C DH L O DS R W1 W2 G Y2 Y1 C C R L DH 7 PROTECTIVE PLASTIC FILM ON DIP SWITCHES MAY BE REMOVED FOR EASE IN SETTING OF DIP SW CUT ON BOARD LINK SOLDER...

Страница 9: ...rob bing equipment connected to system May require installation of larger VA transformer to be installed in furnace air handler Clears after fault recovered E 117 Poor ground detected Warning only Pr...

Страница 10: ...operation after fault is cleared E 225 High pressure switch failed open Check pressure inches w c of high pressure switch closing on heat call Measure operating pres sure inches w c Inspect vent and...

Страница 11: ...ating pressure inches w c Inspect vent and combustion air inducer for correct opera tion and restriction Clears when heat call finishes successfully E 273 Soft lockout Exceeded maximum number of recyc...

Страница 12: ...nit is shipped from the factory with a blower off delay of 90 se conds The blower off delay affects comfort and is adjust able to satisfy individual applications Adjust the blower off delay to achieve...

Страница 13: ...o provide constant torque at each of the five selectable speed taps Each tap requires 24 volts to en ergize Input Voltage Requirements The circuit is designed to be operated with AC voltage To enable...

Страница 14: ...fan 1 2 3 4 or 5 on input plug P49 If 24 volts is not present problem may be up stream of plug P49 Proceed to test 4 Multi Meter set to VAC 12 0 12 0 24 Multi Meter set to VAC Check for 24 volts acros...

Страница 15: ...read approxim ately the same resistance within an ohm 3 Check to see if the blower wheel spins freely FIGURE 11 Motor Test TABLE 8 Scale Measurement range in words ohms 2 M two megohm two million ohms...

Страница 16: ...s are located on the valve A regu lator adjustment screw is located on the valve LPG change over kits are available from Lennox Kits include burner orifices 4 Flame Rollout Switches S47 The EL280DFE i...

Страница 17: ...Page 17 EL280DFE HEATING COMPONENTS FIGURE 13 Ignitor Burners Sensor Gas Valve Manifold and Gas Orifices Rollout Switch...

Страница 18: ...AC volts Test 2 Check ignitor for correct resistance Seperate the 2 pin jack plug near the manifold and check resistance of ignitor at the plug Reading should be between 39 and 70 ohms If the reading...

Страница 19: ...thermostat contacts to cycle system 7 When main burners are in operation for two minutes take reading TABLE 9 Flame Signal in Microamps Normal Low Drop Out 2 6 or greater 2 5 or less 06 FIGURE 15 Meas...

Страница 20: ...d stage the switch senses that the combustion air inducer is operating It closes a cir cuit to the furnace control when pressure inside the com bustion air inducer decreases to a certain set point Set...

Страница 21: ...ails to operate check the following 1 Is the thermostat calling for heat 2 Are access panels securely in place 3 Is the main disconnect switch closed 4 Is there a blown fuse or tripped circuit breaker...

Страница 22: ...n on various metals used in gas piping Use of a specialty Gas Leak Detector is strongly recommended It is available through Lennox under part number 31B2001 See Corp 8411 L10 for further details Do no...

Страница 23: ...nd pressure switch may require adjustment or replacement to ensure proper operation at higher altitudes See table 14 for manifold pressures and table 15 for pressure switch kits and gas conversion kit...

Страница 24: ...E 19 Return Supply Temperatures TEMPERATURE RISE Supply Duct Temperature Return Duct Temperature _ Temperature Rise C External Static Pressure 1 Tap locations shown in figure 20 2 Punch a 1 4 diameter...

Страница 25: ...and unobstructed to provide combustion air 10 Inspect the furnace venting system to make sure it is in place structurally sound and without holes corrosion or blockage Vent system must be free and cl...

Страница 26: ...e careful with the collector box gas ket If the gasket is damaged it must be replaced to prevent leakage 6 Disconnect gas supply piping Remove the screw se curing the burner box cover and remove cover...

Страница 27: ...bustion air inducer Failure to replace all screws may cause leaks Inspect gaskets for any damage and replace if necessary 15 Reinstall burner box manifold assembly and burner box cover 16 Reconnect al...

Страница 28: ...Page 28 VII Wiring and Sequence of Operation EL280DFE Schematic Wiring Diagram...

Страница 29: ...zed on low fire first stage and ignition oc curs At the same time the control module sends a sig nal to begin an indoor blower 30 second ON delay When the delay ends the indoor blower motor is ener gi...

Страница 30: ...er gized on the low fire heating speed and the HUM con tacts are energized The integrated control also initi ates a second stage on delay factory set at 7 min utes adjustable to 12 minutes 5 If the he...

Страница 31: ...T ANY ON BOARD LINKS S1 T STAT FURNACE TERM STRIP OUTDOOR UNIT Not required on all units 1 Heat 2 Cool NOTE Use DIP switch 2 to set second stage heat ON delay OFF 7 minutes ON 12 minutes ON CUT ON BOA...

Страница 32: ...E TERM STRIP OUTDOOR UNIT Not required on all units 2 Heat 2 Cool with t stat with humidity control OFF CUT ON BOARD LINK W915 2 STAGE COMPR CUT ON BOARD LINK W914 DEHUM S1 T STAT FURNACE TERM STRIP O...

Страница 33: ...ON BOARD LINK W951 HEAT PUMP DEHUM L7724U T STAT FURNACE TERM STRIP HEAT PUMP 67M41 Y H L Y2 D B L Y2 Dual Fuel Two Stage Heat Pump ComfortSense 7000 L7724U thermostat w dual fuel capa bilities Capabl...

Страница 34: ...AT PUMP CUT ON BOARD LINK W914 DEHUM L7742U T STAT FURNACE TERM STRIP HEAT PUMP 67M41 Y H L Y2 D B L Y2 Dual Fuel Two Stage Heat Pump ComfortSense 7000 L7742U thermostat w dual fuel capa bilities Capa...

Страница 35: ...OR T STAT IS CYCLED OFF ON FOR 3 SEC MINIMUM NO YES FIRST LOW STAGE PRESSURE SWITCH CONTACTS OPEN NO GAS VALVE OFF COMBUSTION AIR INDUCER OFF INDOOR BLOWER OFF CONTROL REMAINS UNTIL PRESSURE SWITCH I...

Страница 36: ...NDS AFTER GAS VALVE OPENS u0 19 microamps GAS VALVE OFF COMBUSTION AIR INDUCER ON INDOOR BLOWER OFF STATUS LED HEARTBEAT HAS CONTROL FAILED TO SENSE FLAME FOR FIVE CONSECUTIVE TRIES DURING A SINGLE HE...

Страница 37: ...ST STAGE HEAT DEMAND SATISFIED GAS VALVE OFF COMBUSTION AIR INDUCER OFF FOLLOWING POST PURGE INDOOR BLOWER OFF WITH DELAY STATUS LED PULSE YES SECOND STAGE HEAT DEMAND SECOND STAGE HEAT DEMAND REQUIRE...

Страница 38: ...ODE DIP SWITCH SET AT SINGLE YES YES FIRST AND SECOND STAGE HEAT DEMAND SATISFIED SIMULTANEOUSLY STATUS LED HEARTBEAT YES GAS VALVE OFF COMBUSTION AIR INDUCER OFF AFTER 5 SECOND LOW SPEED POST PURGE P...

Страница 39: ...ZED NO IS THERE PROPER GROUND YES NO INDOOR BLOWER ENERGIZED ON FIRST STAGE COOL SPEED AFTER 2 SECOND DELAY FIRST STAGE DEMAND FOR COOL SATISFIED NO THERMOSTAT CALLS FOR SECOND STAGE COOL COMPRESSOR A...

Страница 40: ...TO LOW HEAT SPEED FIRST STAGE HEAT DEMAND SATISFIED YES NO THERMOSTAT CALLS FOR SECOND STAGE HEAT YES INDOOR BLOWER SWITCHES TO HIGH HEAT SPEED AFTER 30 SECOND RECOGNITION PERIOD SECOND STAGE HEAT DE...

Отзывы: