II- PLACEMENT AND INSTALLATION

Make sure unit is installed in accordance with installation
instructions and applicable codes.

III- START‐UP

A- Heating Start‐Up

WARNING

Shock and burn hazard.

EL180UHNE  units are equipped with a hot surface
ignition system. Do not attempt to light manually.

Gas Valve Operation

FIGURE 17

HONEYWELL VALVE

Negative Air
Pressure Port

Positive Air
Pressure Port

Manifold

Pressure Tap

Supply

Pressure Tap

Gas Valve Shown in 

ON

 Position

 1 -

STOP

! Read the safety information at the beginning of

this section.

 2 - Set the thermostat to the lowest setting.

 3 - Turn off all electrical power to the unit.

 4 - This furnace is equipped with an ignition device which

automatically lights the burners. Do 

not

 try to light the

burners by hand.

 5 - Remove the upper access panel.

 6 - Move  gas  valve  switch  to 

OFF position

. Do not

force. See figure 17.

 7 - Wait five minutes to clear out any gas. If you then smell

gas, STOP! Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's instruc­
tions. If you do not smell gas go to next step.

 8 - Move gas valve switch to 

ON position

. Do not force.

See figure 17.

 9 - Replace the upper access panel.

10- Turn on all electrical power to to the unit.

11- Set the thermostat to desired setting.

NOTE - When unit is initially started, steps 1 through 11
may need to be repeated to purge air from gas line.

12- If the appliance will not operate, follow the instructions

“Turning Off Gas to Unit” and call the gas supplier.

Turning Off Gas to Unit

 1 - Set the thermostat to the lowest setting.

 2 - Turn off all electrical power to the unit if service is to be

performed.

 3 - Remove the upper access panel.

 4 - Move  gas  valve  switch  to 

OFF position

. Do not

force. See figure 17.

 5 - Replace the upper access panel.

B- Safety or Emergency Shutdown

Disconnect main power to unit. Close manual and main gas
valves.

C- Extended Period Shutdown

Turn off thermostat or set to “UNOCCUPIED” mode. Close
all gas valves (both internal and external to unit) to guaran­
tee no gas leaks into combustion chamber. Turn off power
to unit. All access panels and covers must be in place and
secured.

IV-HEATING SYSTEM SERVICE CHECKS

A- C.S.A. Certification

All units are C.S.A. design certified without modifications.
Refer to the EL180UHNE Installation Instruction.

B- Gas Piping

Gas supply piping should not allow more than 0.5”W.C. drop
in pressure between gas meter and unit. Supply gas pipe
must not be smaller than unit gas connection.

Compounds used on gas piping threaded joints should be
resistant to action of liquefied petroleum gases.

C- Testing Gas Piping

CAUTION

If a flexible gas connector is required or allowed by
the authority that has jurisdiction, black iron pipe
shall be installed at the gas valve and extend outside
the furnace cabinet.

IMPORTANT

In case emergency shutdown is required, turn off
the main shut‐off valve and disconnect the main
power to unit.  These controls should be properly
labeled by the installer.

WARNING

Do not over torque (800 in-lbs) or under torque (350
in-lbs) when attaching the gas piping to the gas
valve.

When pressure testing gas lines, the gas valve must be dis­
connected and isolated. Gas valves can be damaged if
subjected to more than 0.5psig (14” W.C.). See figure 18

If

the pressure is equal to or less than 0.5psig (14”W.C.),
close the manual shut-off valve before pressure testing to
isolate furnace from gas supply.

Содержание EL180UH040NE36A

Страница 1: ...f local or state codes the guidelines and procedures outlined in this manual except where noted are recommended only and do not constitute code CAUTION As with any mechanical equipment contact with sh...

Страница 2: ...ta lbs 1 package 100 113 125 149 NOTE Filters and provisions for mounting are not furnished and must be field provided 1 Annual Fuel Utilization Efficiency based on DOE test procedures and according t...

Страница 3: ...3 1190 141 1030 86 930 73 835 55 0 10 1380 251 1165 150 990 95 890 89 790 65 0 20 1360 264 1115 158 950 99 840 78 730 68 0 30 1315 278 1090 171 910 110 790 89 660 61 0 40 1295 290 1070 182 865 122 740...

Страница 4: ...5 220 1425 160 2235 595 1945 382 1725 262 1590 202 1430 165 0 10 2175 639 1910 427 1685 287 1545 234 1400 176 2205 611 1915 397 1695 280 1550 218 1400 193 0 20 2145 658 1885 449 1635 309 1490 246 1325...

Страница 5: ...ludes integrated control interlock switch and transformer Blower Assembly Power Choke 4 and 5 Ton Only PARTS ARRANGEMENT Heat Exchanger Combustion Air Inducer Gas Valve Intake Air Elbow Access Panel I...

Страница 6: ...system consisting of an in tegrated control figure 3 with control terminal designa tions in tables 1 2 and 3 sensor and ignitor figure 6 The integrated control and ignitor work in combination to en su...

Страница 7: ...e Switch In 11 Rollout Switch In 12 Gas Valve Out TABLE 3 1 4 QUICK CONNECT TERMINALS 120HUM Humidifier 120VAC LINE 120VAC XFMR Transformer 120VAC CIRC Indoor blower 120VAC EAC Indoor air quality acce...

Страница 8: ...Open or Watchguard Mode Limit Switch Open longer than 3 minutes 8 Rollout Switch Open 9 Pressure Switch failed to close or opened during heat demand 10 Watchguard Pressure Switch opened 5 times durin...

Страница 9: ...air temperature once the heat demand is satisfied Note the supply air temperature at the instant the blower is de energized Adjust the fan off delay to achieve a supply air temperature between 90 110...

Страница 10: ...h unit model number See Lennox Repair Parts Handbook if limit switch must be replaced 7 Gas Valve Figure 6 The valve is internally redundant to assure safety shut off If the gas valve must be replaced...

Страница 11: ...ry make note of the tubing connections to the gas valve See figure 8 NOTE The switch is factory set and is not field adjustable It is a safety shut down control in the furnace and must not be by passe...

Страница 12: ...Page 12 FIGURE 8 Replacing the Pressure Switch or Tubing...

Страница 13: ...s correct then then there is a problem with the wiring between the jack plug and control If the reading is not correct the issue is the ignitor Meter set to ohms Test 3 Insert meter probes into the te...

Страница 14: ...shooting the Motor Troubleshooting the motor is an easy process Follow steps below 1 Shut off power to unit 2 Remove input plugs P48 and P49 from motor See figure 12 for troubleshooting procedure If c...

Страница 15: ...s fan 1 2 3 4 or 5 on input plug P49 If 24 volts is not present problem may be up stream of plug P49 Proceed to test 4 Multi Meter set to VAC 12 0 12 0 24 Multi Meter set to VAC Check for 24 volts acr...

Страница 16: ...read approximate ly the same resistance within an ohm 3 Check to see if the blower wheel spins freely FIGURE 15 Motor Test TABLE 8 Scale Measurement range in words ohms 2 M two megohm two million ohm...

Страница 17: ...it if service is to be performed 3 Remove the upper access panel 4 Move gas valve switch to OFF position Do not force See figure 17 5 Replace the upper access panel B Safety or Emergency Shutdown Disc...

Страница 18: ...he supply pressure tap See figure 16 Loosen the screw and connect a manometer to measure supply pressure See table10 for supply line pressure Tighten screw after measurements have been taken Manifold...

Страница 19: ...s a poor or partial ground Compare the readings to the table below If the read ings exceed the maximum shown in table 12 make re pairs before operating the furnace 2 In addition measure the AC voltage...

Страница 20: ...ply and return air plenums Insert manometer hose flush with inside edge of hole or insulation Seal around the hose with permagum Connect the zero end of the manometer to the discharge supply side of t...

Страница 21: ...X 1 1 16 X 25 X 1 1 C 21 16 X 25 X 1 1 20 X 25 X 1 1 6 Evaluate the heat exchanger integrity by inspecting the heat exchanger per the AHRI heat exchanger inspec tion procedure This procedure can be v...

Страница 22: ...gn matter Remove any blockage Figure 23 shows burner detail Replace gasket between burner plate and air fuel plenum then re install burner plate 10 To clean the combustion air inducer visually inspect...

Страница 23: ...BLY HEAT EXCHANGER REMOVAL FIGURE 23 Gas Valve Air Intake Assembly leave intact Heat Exchanger Air Gas Plenum Gasket Burner Burner Box Liner leave intact FIGURE 24 Remove 5 screws if necessary either...

Страница 24: ...ue 5 A92 integrated control energizes B6 combustion air inducer S18 combustion air pressure switch closes Once S18 closes a 15 second pre purge follows 6 A92 integrated control energizes R33 ignitor A...

Страница 25: ...rated control energizes B6 combustion air inducer S18 combustion air pressure switch closes Once S18 closes a 15 second pre purge follows 6 A92 integrated control energizes R33 ignitor A 20 second war...

Страница 26: ...VE ENERGIZED GAS VALVE OFF COMBUSTION AIR INDUCER ON INDOOR BLOWER ON HEATING SPEED LED FLASHES CODE 11 PRESSURE SWITCH CLOSED GAS VALVE OFF COMBUSTION AIR INDUCER OFF INDOOR BLOWER OFF WITH DELAY Seq...

Страница 27: ...IMES FLAME SIGNAL 1 5 MICROAMPS OR GREATER YES YES YES ROLLOUT SWITCH CLOSED LED FLASHES CODE 8 ROLLOT SWITCH OPEN GAS VALVE POWER OFF COMBUSTION AIR INDUCER POWER ON INDOOR BLOWER ON SEQUENCE HOLDS U...

Страница 28: ...OSED LED SLOW FLASH RATE REMAINS UNCHANGED THROUGHOUT COOLING CYCLE THERMOSTAT CALLS FOR COOLING COMPRESSOR CONTACTOR AND SYSTEM FAN ENERGIZED WITH 2 SECOND DELAY COOLING SPEED EAC TERM ENERGIZED COMP...

Страница 29: ...FAN SWITCHED TO COOL SPEED EAC TERM REMAINS ON THERMOSTAT OPENS MANUAL FAN SELECTION MADE AT THERMOSTAT CONTROL G ENERGIZES SYSTEM FAN AT FAN SPEED EAC TERM ENERGIZED NO YES YES NO SYSTEM FAN SWITCHE...

Отзывы: