27
3.1.- PRELIMINARY CHECKS BEFORE FIRST INSTALLATION
- Check that the
power supply
is the same as stated on the Rating Plate which is in agreement with the electrical
diagram for the unit and that cable sizes are correct.
- Check that
tightness of the electrical connections to their terminals and to ground
.
- Check the
control panel connections.
(If the connection is incorrect, the unit will not operate and the control panel display will not light).
- Check with your hand that the
fans are turning freely.
FIGURE FOR THE STANDARD UNIT CONFIGURATION FOR MODELS:
055D-070D-085D
3.- COMMISSIONING AND OPERATION
Legislation does not allow refrigerant gas emissions to the atmosphere, so the refrigerants have to be recycled
to avoid being released to the atmosphere. Those recycled refrigerants shall be processed afterwards by an
authorized waste manager.
Those components derived from the recycling of the unit have to be managed by authorized waste manager or be
left in local waste facilities according the local normative in each country.
Содержание CMC 020S
Страница 23: ...22 2 INSTALLATION 2 7 ELECTRICAL CONNECTIONS COMFORT AND SERVICE TERMINAL...
Страница 34: ...33 NOTES...
Страница 35: ...34 NOTES...