
507581-05
Page 35 of 62
Issue 2220
Figure 53. Condensate Trap Locations
(Unit shown in upflow position with remote trap)
*Piping from furnace must slope down a minimum of 1/4” per ft.
toward trap.
Figure 54. Unit with Evaporator Coil
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
IMPORTANT