Page 2
C BOX UNITS (156 THROUGH 300S)
NO WIRING MAKE−UP BOX
FIGURE 2
SEAL
WATERTIGHT
ROUTE WIR-
ING IN FIELD
PROVIDED
CONDUIT
GFI IN
HANDY
BOX
10"
(254mm)
L−BRACKET
5− Install handy box in location as follows:
Figure 3
LG/LC/LH A Box units
Figure 4
TG/TC/TH/KG/KC/KH A Box units
Figure 5
B Box units with wiring make−up box
B Box units NO wiring make−up box
Figure 6
C Box units with wiring make−up box
facing the front of unit
C Box units NO wiring make−up box
Figure 7
C and D Box units with wiring make−up
box facing the side of the unit.
Note − Use #6 screws to secure handy box to LG/LC/LH
036−072 units and #10 screws to secure handy box in all
other units.
6− Route field−provided wiring through conduit and
appropriate knock−out in handy box. Connect wires to
terminals on back of GFI receptacle according to
wiring diagram on unit and local codes.
7− Secure GFI receptacle to handy box with 2 screws
provided with receptacle.
8−
LG/LC/LH A box Units −
Install receptacle flip−cover over GFI receptacle on
outside of unit. Secure with 4 #6 screws.
LG/LC/LH/TG/TC/TH/KG/KC/KH A, B, C, & D Box
Units −
Install GFI faceplate on receptacle; screws and
faceplate are packaged with the receptacle.
FIGURE 3
SEAL
WATERTIGHT
LG/LC/LH A BOX UNITS (036 − 072)
GFI RECEPTACLE
ROUTE WIRING IN FIELD−
PROVIDED CONDUIT
HANDY BOX
INSTALL HANDY BOX
ON INSIDE OF UNIT;
SECURE FROM OUTSIDE
TG/TC/TH/KG/KC/KH A BOX UNITS (024−072)
FIGURE 4
ROUTE WIRING IN FIELD−
PROVIDED CONDUIT
GFI IN
HANDY BOX
SEAL
WATERTIGHT