
INSTALLATION INSTRUCTIONS FOR
HEADEND UNIT
RACK MOUNTED
The Gold unit is designed to be installed in
a
standard 19” rack.
Use four of the appropriate screws designed for the rack to mount the unit.
IMPORTANT:
A 1RU of empty space is required immediately above the Gold unit for heat
dissipation. Failure to leave a 1RU of empty space above the unit can result in the unit overheating
and eventual failure.
Rubber feet are available to place the unit on a shelf or desk if a rack is not available. Contact
Lencore for more information at 516-682-9292 or [email protected].
WALL MOUNTED
1. Unscrew bracket from headend unit.
2. Reorient bracket to have the lower 4 holes on the bracket align with the upper 4 holes on
the headend as shown on the diagram.
3. Fasten bracket to headend using supplied screws.
4. Secure bracket with fasteners (not included) to the wall as shown on the diagram.
PWR
SPL
CPU
GEN
RL1
AUX
FTR1
FTR2
FUNC OPT
SEL
A1U
FLT
ERR
RUN
TX
RX
N1
AUDIO LEVEL
LOW
CLIP
GOOD
12
Содержание GOLD A1U
Страница 1: ...GOLD DESIGN INSTALLATION AND OPERATION GUIDELINES Model A1U...
Страница 17: ...INSTALLATION DIAGRAMS Top Bottom Side 14...
Страница 18: ...C L For additionalTechnical Support call 516 682 9292 INSTALLATION DIAGRAMS Tile Bridge TB4 Not Shown 15...
Страница 20: ...Gold Decorative Pendant Speaker installation diagram 4 x 1 5 17...
Страница 22: ...INSTALLATION DIAGRAMS 0 0 19...
Страница 31: ...Clicking on an OP will bring up the Controls and Tabs for that OP 28...