Installation manual - English
Floor boards should be fixed to every foundation bearer with nails 2,5x50 mm. For nicer finish we
suggest to nail the boards from top part of the tongue so the head of the nail will be covered with
groove of next board.
The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and
walls. If necessary, cut the floor beadings to the suitable length.
ATTENTION
: Depending on the climate at the house location, the floor boards can either swell or
diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you
can install the boards densely because they will become drier and spaces may appear between them.
Walls
When installing the walls, it is important to remember that:
➢
The logs are always assembled with their tongue upwards!
➢
If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!
Install the walls in accordance with the appended wall plans (see Technical specifications).
First of all place half logs of front and back wall at the
correct location and attach them with screws to the
foundation joists. Then install the side wall logs. Make sure
that the first layer of logs extends a bit over the foundation
joists: the logs must extend over the joists by some 3-5 mm.
You will thus protect the house from moisture, allowing the
free flow of rainwater into the ground.
ATTENTION
:
After the first layer of logs, measure the
diagonal lengths and, if necessary, re-install the logs. Only if
the diagonal lengths are completely equal is the base frame
rectangular and you can mutually attach the logs.
The first layer of logs:
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Содержание 103709
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 11: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 12: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 13: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 14: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 15: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 16: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Страница 17: ...Pst2 Pst1 Sla1 ...
Страница 18: ...5x90 4pcs Ø5 1 2 5 50 ...
Страница 19: ...A A A A 40 TU28 61P 009 010 Rel 1 3 5x50 x3 ...
Страница 20: ... 3 5x50 3 5x50 010 009 5x90 x3 5x90 x3 ...
Страница 21: ...UP3 UP2 UP1 UP2 UP3 UP1 Det1 RoR2 RoR1 RoR1 RoR2 RoR3 RoR3 RoR3 ...
Страница 22: ... 5x90 Ø3 1 2 5x90 2 5x50 3 5x40 3 5x40 3 5x40 UPx RoRx ...
Страница 23: ... 5x90 Ø3 1 2 5x90 Det1 ...