ASSEMBLY / INSTALLATION INSTRUCTIONS:
PART NUMBER:
00-JBRTT-1389
TOOLS REQUIRED
•
13mm wrench
INSTALLATION TIME
SKILL LEVEL
2= novice
25-30 minutes
Basic knowledge of hand tools required
2
1
4
3
LEITNERDESIGNS.COM | [email protected] | 949-395-3049
V1 | Page 2
▼
hardware
▼
RAIL bOLT
(x4)
M8 T-bolt
(x8)
m8 lock nut
(x16)