1.
The first step when staking out is to find the catch point of the
slope. As the natural surface is unknown, the process is iterative. As
soon as the measured position (e) is close enough to the real catch
point (c), it can be used as the approximate catch point. Based on
this approximate catch point, the projected catch point (d) on the
slope is calculated.
No reference point offset and no traveller height are taken into
account for this step. The projected catch point (d) is then used as a
starting point for the stakeout of the reference peg (g).
2.
The second step is to stake out the reference point relative to the
projected catch point. Select
Place reference peg
from the toolbox.
Values in
Stake Slope Reference Pt
guides the user to the position
to place the peg. The defined reference point offset (f) is already
taken into account.
The catch point is marked indirectly using the reference peg. Values
to be marked on the reference peg can be found on
Stake Slope
Reference Pt
,
Info
page.
The closer the real catch point and the approximated stakeout catch point are,
the closer the projected catch point gets to the real catch point.
Description
When staking out slopes with the
Batter rail vertical
or
Batter rail perpen-
dicular
method, the grade of the slope is marked with a board. Using this
method it is not necessary to stake out the catch point first.
For Batter rail vertical
Road_024
a
c
b
d
e
a
c
b
d
e
1
2
1 Batter rail for a cut
2
Batter rail for a fill
a
Slope to stake out
b
Natural surface
c
Catch point of the slope
d
Rail over ground
e
Rail over batter, vertical
For Batter rail perpendicular
Road_101
a
c
b
d
e
a
c
b
d
1
2
e
1 Batter rail for a cut
2
Batter rail for a fill
a
Slope to stake out
b
Natural surface
c
Catch point of the slope
d
Rail over ground
e
Rail over batter, perpendicular
The defined rail over ground should guarantee that the rails are positioned as
high as possible, to make them easier to use.
Slope staking using
Batter rail vertical or
Batter rail perpendic-
ular
Roads - Road
751
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...