Automatic calculation of the geometric ppm value
When
Compute scale from: Current setup
:
•
the ppm values for
Map projection ppm
,
Height ppm
and
Geometric
ppm
are automatically calculated. The coordinates of the current instru-
ment setup stored in the internal memory are used, which are based on
the currently active coordinate system.
•
each time an app is accessed, the geometric ppm value is automatically
calculated. The coordinates of the current instrument setup stored in the
internal memory are used (these coordinates may have been updated),
which are based on the currently active coordinate system (this coordinate
system may have changed). This way, the user is always working with the
correct geometric ppm value.
•
when the
None
coordinate system is chosen, then the geometric ppm
value cannot be automatically calculated. A message appears, allowing the
user to either manually enter the ppm values or accept ppm values of 0.
All jobs on the available data storage devices are listed.
Select the jobs you want to link.
Check a box if you want to link the control job to the job.
Key
Description
OK
To return to
New Job
,
Linked jobs
page.
Check box behaviour
Description
Checks or unchecks the check box of the highlighted job. The
behaviour depends on the current status of the check box.
Checks or unchecks the check box of the highlighted job. The
behaviour depends on the current status of the check box.
Move the focus on the screen upwards.
Move the focus on the screen downwards.
Tapping the
check box
Checks or unchecks the check box depending on the current
status of the check box. Highlights the line.
Space bar
Starts the job search.
Description of metadata
Metadata
Description
-
The name of the job.
Choose Linked Jobs
Job Menu - Jobs
61
Содержание Captivate
Страница 1: ...Leica Captivate Technical Reference Manual Version 3 0 English...
Страница 153: ...3 Continue as if creating a new polyline Refer to Create new polyline Several segments Creating Points and Lines 153...
Страница 561: ...Next step Store saves the new coordinate system QuickGrid 561...
Страница 786: ...7 Stake Line To stake out the selected intersection point all delta values must be 0 000 786 Roads Road...
Страница 812: ...Tunnel Profile Editor Profile details view Tunnel Profile Editor Layer details view 812 Roads Tunnel...
Страница 839: ...Field Option Description Offset limit Editable field Maximum horizontal offset from defined pro file Roads Tunnel 839...
Страница 848: ...Field Option Description Scans com pleted Display only Number of scans being measured Number of total scans 848 Scanning...