background image

 

Stairlift ALPHA Installation Manual 

Edition March 2014

 

ALPHA

 

stairlift 

page 9 of 14 

Copper plate in correct position 

Charging/limit assembly 
in correct position 

Installing of the charging station/limit assembly 

The chairlift is stop when it reaches the end of the charging station by the metal pin 
pressing the lower carriage contact plate. Make sure the seat stops in the correct place 
and mark this spot for the charging station. Then fix the charging station by drilling 2 
threaded holes (dimension M5) into the pipe. Fix the charger close to the upper or lower 
landing station, where it is most convenient. Then connect the charger to the landing 
stations closest to the charger. Connect the negative to the rail and the positive to the 
copper of the charging station. 
Connect all copper plate on all charging stations with 1 cable. Run this cable in the lower 
tube of the rails and bring it out close to each charging station.

 

On inclined rail parts the electrical ground is transferred to the board via the rack. But in horizontal 

section this ground connection can be unstable. Therefore, in case of a horizontal stop or 
an intermediate landing it is necessary to add a copper plate onto the upper tube. This 
copper plate ensures the electrical ground connection to the stairlift board. 

After the charging stations has 
been fixed in its final position, 
please run the seat in this stop 
and check where the lever for the 
speed reduction in curves is 
positioned when the stairlift is in 
the stop position.  

The copper plate now needs to be 
placed on this exact spot. Drill and 
tap the upper tube to fix the 
copper plate.  

When the lift is in the stop position 
the speed reduction lever  
is pressing against this copper  

 

plate in the upper stop. 

 

Ultimate limit 
switch curve

Fixing screws

Charging and 
speed 
reduction curve

Pin for landing 
limit switch 

Negative to 
rail  

Positive to 
copper  

Содержание ALPHA

Страница 1: ...Web www lehner lifttechnik at Tel 4372783514 Email office lehnerlifttechnik at Mobile 436645453689 Installation Manual ALPHA C h a i r s t a i r l i f t ...

Страница 2: ...TALLATION 2 INSTALLATION OF THE RAILS 3 INSTALLATION OF THE DRIVE UNIT ONTO THE RAIL 5 EXPLANATION OF UPPER AND LOWER TROLLEY 7 SPEED REDUCTION LEVER SLOWDOWN ARM FOR CURVE SPEED 8 INSTALLING OF THE CHARGING STATION LIMIT ASSEMBLY 8 OVERSPEED GOVERNOR 12 SOUND INDICATION 12 PROGRAMMING OF REMOTES 12 TROUBLESHOOTING 13 ATTACHMENTS 14 ...

Страница 3: ... installation company is responsible for the fixing of the rail to the wall or the pillars to the floor steps Check the packages for shipping damage and missing parts before bringing the lift to the site Take pictures of damaged parts as soon as these are discovered to provide proof for warranty claims A team of 1 qualified technician and an assisting technician is necessary to install the lift Be...

Страница 4: ...is can be done at the end of the installation If the rail is long this should be done while combining the individual rail parts In this case please enter the cable into the first part and then before combining the rail part also into the second rail part and so forth Step 3 Add the second rail part Now make sure the vertical measures from the first pillars Y1 and the first pillar of the second rai...

Страница 5: ... at the correct height with the 3 worm screws Step 6 When all rail parts are connected and all pillars a set to the correct height check again all clearance measures and the correct position of the rail according to the installation drawing Step 7 If all is ok fix the pillars to the steps Use appropriate fixing material according to the staircase material ...

Страница 6: ...t on the floor so that it is standing upright Step 2 Take off the wooden plates on each side Put the drive unit on the floor use protection under it so not to scratch it Then 2 people should lift the drive unit on the rails and attach the installation rails to the top of the installed rail on the staircase Then slide the drive unit down until it reaches the top of the installed rail Use the handwh...

Страница 7: ...e unit Step 4 Use cable ties to fix the connection cable between from the chair to the drive unit Makes sure the seat can freely rotate with the cable getting twisted or squeezed Before fixing the cables rotate the seat to the maximum then fix cables in place and rotate back and forth to see if the cable moves freely Step 5 Now drive the unit down and up to check if the seat passes all steps and i...

Страница 8: ...ng the landing station charging cams On an intermediate stop assembly this pin is pressed further inside and then additionally activates the intermediate stop switch This only happens on intermediate stops not on end stops Pins for charging speed reduction and intermediate stop Ultimate limit switch pin Pins for Charging speed reduction and intermediate stop Ultimate limit switch pin Intermediate ...

Страница 9: ...the rails at the start of the installation Then check if the unit slows down correctly in the curves and drives fast in the straight sections The lever is activated by the rail When the lift drives into a curve the rail bend presses the lever so that is activates the speed reduction switch If the unit does not slow down correctly please bend the lever a little so that the speed reduction switch is...

Страница 10: ...his cable in the lower tube of the rails and bring it out close to each charging station On inclined rail parts the electrical ground is transferred to the board via the rack But in horizontal section this ground connection can be unstable Therefore in case of a horizontal stop or an intermediate landing it is necessary to add a copper plate onto the upper tube This copper plate ensures the electr...

Страница 11: ...f the seat rotation switch and the armrest switch Check the function of the curve speed reduction switch lever Check the function of the landing stations speed reduction pin switch Check the function of the intermediate landing pin switch Check the function of the final stop pin switch Check the function of the landing limit switch This is the contact switch in the safety pads of the lower trolley...

Страница 12: ...switches If the LED is on all limit switches are not pressed For example if the unit is in the lower stop LED 26 will be off indicating that the directional limit switch for the down drive is pressed LED 14 indicates that the lift is outside a charging station It is off if the lift is in the charging station LED 15 indicates that the lift is in an intermediate stop position It is on when outside a...

Страница 13: ... long signal If the battery voltage is getting low a beep sound will appear every 2 5 seconds with a 2 second long signal Programming of remotes The remotes come already programmed In case you need to programme new remotes press the programming button on the main board for 2 seconds The LED on the remote receiver should start flashing fast every 0 5 seconds instead of every second Then press the u...

Страница 14: ...e external control shows a blinking green light If the lift is blinking orange then the receiver does not receive the signal If it is blinking green it is receiving correctly If you press the drive up or down button the LED 8 or 9 should come on If not the board does not receive the drive command from the receiver The seat drives only in 1 direction Check the LED 25 and 26 If one of the 2 LEDs is ...

Страница 15: ...op in the intermediate stop station The charging pin has 2 functions positions depending on how much it is pressed First it slows down the speed as soon as the lift gets to the charging station Second when arriving at an intermediate landing it is pressed some more and actives the intermediate landing switch Check if this second switch is pressed correctly in the intermediate landing stop Attachme...

Страница 16: ......

Отзывы:

Похожие инструкции для ALPHA