installation
1
|
Plug unit into 120 VAC power socket protected by fuse or circuit breaker.
2
|
With no load connected the unit will automatically become energized and
the indicator will blink green and amber after 10 seconds.
3
|
Press “Test/Off” button.
4
|
Verify the lamp indicator changes to blink white and amber
(this step denotes that power is off).
5
|
Press and release “Reset/On” button for use.
6
|
Connect the desired load equipment to cord receptacle and operate
equipment normally.
NOTE: All three plugs are controlled together.