26
4. Installation
- for the connection of the battery cables to the Keor MOD UPS side, consult the installation manual of the UPS.
4.3
Battery drawers installation
The modular battery cabinet for Keor MOD may include two to sixteen internal battery drawers. Each battery string is
made up of two drawers, therefore it is necessary to install them two by two.
The battery drawers have a specific order in the cabinet that must be kept.
During the installation it is necessary to use the appropriate Personal Protective Equipment (see paragraph 2.3).
Содержание KEOR MOD
Страница 1: ...Part LE13573AA 03 22 01 GF 310484 Modular Battery Cabinet Keor Mod Installation manual ...
Страница 2: ...2 EN ENGLISH 3 310484 Modular Battery Cabinet Keor Mod ...
Страница 20: ...20 4 Installation 3 4 5 ...
Страница 22: ...22 4 Installation 9 10 ...
Страница 42: ...42 8 Mechanical characteristics ...
Страница 43: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 43 ...
Страница 44: ...44 8 Mechanical characteristics ...
Страница 45: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 45 ...
Страница 46: ...46 8 Mechanical characteristics 8 1 Battery drawer all the dimensions are in mm ...
Страница 50: ...50 ...
Страница 51: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 51 ...