LEGRAND Evolution ATCFF Скачать руководство пользователя страница 2

2

Step 2

Remove cover plates by
removing (5) 8-32 screws.

Step 3

Remove 3/4" plug from small
cover plate by rotating counter-
clockwise using a large straight
blade screwdriver. Install 3/4"
conduit fitting (provided) into
opening on large cover. Repeat
procedure for 2" conduit fitting,
on large cover plate. (provided)

NOTE: If necessary remove Feed Plates to pull communications wires through

Poke-Thru device. Replace Feed Plates when finished pulling wires.

Step 4

Feed 3/4" inch flexible conduit
into 3/4" conduit fitting on cover
plate. Feed power wires through
small compartment and into the
junction box. Make wiring con-
nections in the junction box.
Refer to copper cross section
chart to determine quantity of
wires to pass through each open-
ing. Attach cover to the flange
using (2) 8-32 x 3/8" screws.

Step 5

Feed data wires through larger compartment and through 
2" conduit fitting on cover plate. Refer to copper cross 
section chart to determine quantity of cables to pass
through each opening. Attach cover to the flange using 
(3) 8-32 x 3/8" screws.

Step 1

Place appropriate gasket
around Poke Thru and
slide under flange. Use
flat foam gasket for tile
applications or use round
neoprene gasket for 
carpet applications.

Tile Gasket

Carpet
Gasket

INSTALLING COMPLETE ASSEMBLY

CAUTION:  To maintain fire classification, Feed Plates must be installed.

NOTE: Splices must be made in junction box. 

Содержание Evolution ATCFF

Страница 1: ...ordance with Sec 300 22 C of the National Electrical Code Evolution Series 6 Furniture Feed Poke Thru Devices I N S T A L L A T I O N I N S T R U C T I O N S Installation Instruction No 1 007 155 R2 U...

Страница 2: ...tion box Make wiring con nections in the junction box Refer to copper cross section chart to determine quantity of wires to pass through each open ing Attach cover to the flange using 2 8 32 x 3 8 scr...

Страница 3: ...Poke Thru once it has been installed in the floor Step 6 Orient Poke Thru so that the three channels span across the corrugations of the deck Push Poke Thru into floor Device openings must span across...

Страница 4: ...ent Stem Assembly such that the three channels span across the corrugations of the deck Insert Stem Assembly into core hole Step 2 Remove disposable plate and 2 plate clips by removing the 8 32 screws...

Страница 5: ...ve cover assembly from Poke Thru by removing 2 8 32 screws and lifting cover off CONFIGURING FEED PLATES Step 4 Use 4 8 32 screws to install new feed plate or housing Step 3 Remove 4 8 32 screws and p...

Страница 6: ...area in each span 2 Concrete Minimum thickness of structural concrete topping of 2 1 4 57mm over metal deck or a minimum 3 76mm thick reinforced concrete slab Unit weight of concrete to be 110 to 155...

Страница 7: ...7...

Страница 8: ...0709 Copyright 2009 Wiremold All Rights Reserved CAUTION When printing copies of this template please be sure template is scaled correctly and is the correct size once it is printed Covered Floors 6...

Отзывы: