background image

Symmetry EZ K-120 Adjustable Base Owners Manual 290-0063

15

reMote control PrograMMing

  

(1 or 2 remote controls - 2 bases)

Program One Remote to Operate Two Bases (Tandem 

Syncing)

 - perform the following numbered procedure. 

Note: Make sure both bases are flat before beginning 

procedure. 

steP 1
Plug both adjustable bases into working, grounded 
electrical outlet. Operate both remote controls 
to verify each remote functions properly with its 
respective base. 

NOTe: See 1-to-1 programming 

procedure if bases do not operate.

steP 2
Using remote controls, adjust both bases to flat position. 

steP 3

UNPLUG

 both bases from electrical power outlet.

steP 4
Choose base 1 remote. Retain base 2 remote control 
as a spare or use if 2 remotes are desired to operate 
both bases.

steP 5
Position both bases on their sides, in close proximity 
to each other. 

CAUTION: AT LeAST TWO PeOPLe 

ARe ReCOMMeNDeD FOR HANDLING AND 

MOVING ADJUSTABLe BASe.

steP 6
Locate sync cable (

FIGURE 12

).

SYNC CABLE

FIGURE 12

steP 7
On the control box of 

base 1, 

press in on tabs of 

connection cover and lift up to remove. Repeat to 
remove connection cover of control box for 

base 2

 

(

FIGURE 13

).

steP 8
Plug one end of the sync cable into the sync port 
(on the control box) of 

base 1

. Plug the other end 

of the sync cable into the sync port (on the control 
box) of 

base 2

 (

FIGURE 13

).

REMOTE 

CONTROL 1

REMOTE

CONTROL 2

BASE 1

BASE 2

SYNC 

CABLE

SYNC 

PORT

CONTROL 

BOx

CONNECTION 

COvER

FIGURE 13

LEARN 

BUTTON

TAB

TAB

steP 9
Replace connection covers on both control boxes.

 

steP 10
Turn both bases over so they are resting on their legs. 

CAUTION: MAke SURe CABLe IS CLeAR OF BASe 

AND FRee OF ANy PINCH POINTS.

steP 11
Plug both bases into working, grounded electrical 
outlet.

steP 12
Operate remote control/s to verify both bases 
operate simultaneously.

One or two remote controls are now programmed to 
operate two bases.

Note: To revert back to 1-to-1 programming, remove 

sync cable from control boxes.

Содержание Symmetry EZ

Страница 1: ...owners manual setup guide K 120 Symmetry EZ...

Страница 2: ......

Страница 3: ...ly 6 Remote Control Function 13 Remote Control Programming 14 Troubleshooting 16 Warranty 17 contents If adjustable base does not operate or if parts are missing call 800 888 3078 Do not contact retai...

Страница 4: ...creep downward from the elevated position PRODUCT RATINGS The base lift motors are not designed for continuous use Reliable operation and full life expectancy will be realized as long as the lift mot...

Страница 5: ...uction manual may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful in...

Страница 6: ...lace adjustable base shipping container on solid level surface Remove top section of shipping container Remove packing material Carefully lift adjustable base out of bottom section of shipping contain...

Страница 7: ...STEP 2 Remove cotter pin and bolt from hinge one on each side and fold adjustable base out flat FIGURE 2 STEP 3 When base is flat reinsert bolts and cotter pins FIGURE 3 Remove cotter pin bolt bolt ba...

Страница 8: ...a Cut zip tie and remove packing material covering foot actuator FIGURE 4 STEP 4b Remove cotter pin and mounting bolt from head end of foot actuator Retain for attaching foot actuator to base frame FI...

Страница 9: ...of acuator is placed between the mounting points on base frame Place bolt through mounting holes of base frame Secure in place using cotter pin FIGURE 6 Note When installed actuator must face side of...

Страница 10: ...me 1 Power Supply power brick and electrical power cord 1 Sync Cable split sizes only 1 Owners Manual 1 Warranty Activation Card Cut the zip tie and remove the mattress retainer Caution Exercise cauti...

Страница 11: ...wnward and snap cable latch in closed position Note Align pins before inserting plugs FIGURE 7 Plug electrical power cord into a working grounded electrical outlet Note An electrical surge protection...

Страница 12: ...tress retainer inserts foot end of base Typical adjustable base installation is now complete STEP 12 Install mattress on adjustable base STEP 8 Gently rotate over so base is resting on its legs STEP 9...

Страница 13: ...d foot up button Press and hold to raise the head and foot sections simultaneously foot up button Press and hold to raise the foot section head down button Press and hold to lower the head section hea...

Страница 14: ...multaneously press and hold the head down and foot up buttons on the remote control FIGURE 10 figure 11 foot up head down figure 10 learn button control box STEP 3 While holding the head down and foot...

Страница 15: ...COMMENDED FOR HANDLING AND MOVING ADJUSTABLE BASE Step 6 Locate sync cable FIGURE 12 SYNC CABLE figure 12 Step 7 On the control box of base 1 press in on tabs of connection cover and lift up to remove...

Страница 16: ...minutes before trying to operate the base Once the base resumes normal operation do not exceed the duty cycle Base mechanism may be obstructed Elevate base and check for obstruction Remove obstruction...

Страница 17: ...nstallation of the replacement part and a portion of the cost of the replacement steel and mechanical part based on the number of months that the base has been owned by you since the fourth anniversar...

Страница 18: ...vice due to lack of accessibility the service call will be billed to You and the service will have to be rescheduled L P makes no other warranty whatever express or implied and all implied warranties...

Страница 19: ......

Страница 20: ...290 0063 EDR14103 5 17 NATIONWIDE CUSTOMER SERVICE toll free 800 888 3078 2017 Leggett Platt Adjustable Bed Group a division of Leggett Platt Incorporated...

Отзывы: