D
NATIONWIDE CUSTOMER SERVICE
toll free: (800) 888-3078
99301589-c EDR13494 3/16
© 2016 Leggett & Platt Adjustable Bed Group, a division of Leggett & Platt, Incorporated
3
START HERE. . .
Verify contents; inspect for damage.
A - (4) Legs (wood
or
steel)
B - (1) Remote Control
C - Headboard Bracket Hardware Blister Pack
D - (2) Headboard Bracket Assemblies
E - Power Cord
F - Power Supply Brick
G - Dual Sync Cable (split sizes only)
H - Bedroom Accessory Control
I - Mattress Retainer (cut zip tie to remove)
4
7
If adjustable base will not operate, refer to the Troubleshooting Guide or
detailed instructions in the owners manual. Visit
lpadjustablebases.com
to
download.
5
8
6
INSTALL HEADBOARD BRACKETS.
1a
1b
2
INSTALL MATTRESS TO COMPLETE SETUP.
OPERATE REMOTE CONTROL TO VERIFY ALL FUNCTIONS OF
BASE ARE ACTIVE.
BLUETOOTH ENABLED TECHNOLOGY
To download Premier Series™ app, go to either the Google Play
store for Android devices or the Apple Store for iOS devices.
(Defaut passcode for app is 4321.)
Most adjustable bases will fi t into existing headboard/footboard/
siderails or bed frames. If headboard is required, attach
headboard bracket assemblies (D1 & D2) with hardware included
and install headboard.
D2
D1
Mounting Hardware
blister
pack
REMOVE HARDWARE BOX. CUT ZIP-TIE AND REMOVE
MATTRESS RETAINER. SCREW WOOD LEGS INTO
BASE FRAME.
CAUTION: DO NOT ATTEMPT TO SCREW
LEGS INTO ANY OTHER INSERTS. THIS WILL DAMAGE
PRODUCT.
INSTALL MATTRESS RETAINER.
SYNC BASES (OPTIONAL)
Place mattress retainer ends into grommeted holes in top
surface of adjustable base. Press down until horizontal
retainer section is fl ush against base.
On base 1, make sure primary/secondary button on the
control box is in the “out” position. On base 2, make sure the
primary/secondary button is in the “in” position. Then, insert
the dual sync cable into the CAN/BUS 17 port of both bases.
REMOVE HARDWARE BOX. CUT ZIP-TIE AND REMOVE
MATTRESS RETAINER. SCREW STEEL LEGS INTO
BASE FRAME.
LPAdjustableBases.com
*Furniture Design shown
INSTALL BATTERIES IN POWER DOWN BATTERY COMPARTMENT.
NOTE: Batteries not included.
Squeeze sides in to remove; pop back in to replace.
C
*Furniture Design
A2
PLUG POWER CORD INTO POWER SUPPLY.
ROTATE BASE TOP-SIDE-UP, THEN PLUG POWER
SUPPLY INTO A WORKING, GROUNDED ELECTRICAL
POWER SOURCE (OUTLET).
NOTE: An electrical surge
protection device is recommended (not included).
*if you are setting up a king size base (two TXL bases tandem
synced together), sync bases prior to rotating bases top-side-up.
I
AT LEAST TWO PEOPLE ARE RECOMMENDED FOR
HANDLING AND MOVING ADJUSTABLE BASE.
WHEN
TURNING BASE TOP-SIDE-UP, DO NOT LET BASE REST
ON SIDES OF LEGS!
H
E
F
G
A1
A2
*Foundation Design
A2
Squeeze sides in to
remove.
Power down battery
compartment
Control Box
Power cord
Power supply
Primary/Secondary
Button
CAN/BUS
17 Port
Dual Sync
Cable
Control Box
Batteries installed
Power down battery
compartment
B
I
PREMIER
™
FOUNDATION
AND
FURNITURE
DESIGN
QUICK SETUP GUIDE