Performance Models Pro-motion Owners Manual 99301466-b
9
INSTALLATION
STEP 6
Plug electrical power cord into a working, grounded electrical outlet.
Note: An electrical surge protection device is recommended (not included).
STEP 7
Briefly activate all functions of the base with the remote control to verify
all features are in working order. If base does not operate, refer to the
Troubleshooting
section of this manual.
STEP 8
Return base to the level position.
STEP 9
Install mattress retainer at the foot end of the adjustable base as follows:
a. Locate grommeted holes at foot end of base.
b. Place mattress retainer ends into grommeted holes in top surface
of adjustable base (
FIGURE 2
). Press down until horizontal retainer
section is flush against base.
FIGURE 2
FOOT END OF BASE
MATTRESS
RETAINER
NOTE: If base is to be set up without a headboard, install
mattress to complete basic installation. If headboard
is to be installed, proceed to Headboard Bracket
Installation. (Headboard Bracket sold as accessory.)
Содержание Performance Pro-motion Queen
Страница 1: ...LPAdjustableBases com owners manual PRO MOTION Queen Split Cal King ENGLISH SPANISH FRENCH ...
Страница 2: ......
Страница 63: ......