ASSEMBLY

ELECTRICAL CONNECTIONS

Install  the  heating  unit  boxes  in  the  correct  location, 

with the height adjusted so that the lid is flush with the 

concrete surface, before pouring the concrete.  Refer 

to the instructions on the box cover.
1.  Run  conduit  from  one  of  the  cable  inlets  on  the 

box  to  the  local  disconnect  for  230V  power.  Run 

conduits  from  the  remaining  cable  inlets  to  a 

convenient location above the slab for each of the 

24V thermostats.

2.  (Optional)  For  future  conversion  to  water  insert, 

connect the sleeves for the inlet and outlet water 

pipes to the water pipe connections of the furnace 

box.  Install  the  water  pipes,  and  make  sure  they 

extend at least 100 mm (4") into the box. As well, run 

a conduit for optional signal wiring to the boiler. 

3.  After  the  concrete  has  dried  sufficiently  with  the 

construction heater, prepare the box for the heating 

unit  according  to  the  steps  below,  which  are  to 

be  performed  by  an  authorized  electrician  and 

plumber.

1.  Check  the  electrical  data  on  the  unit  so  that 

other  installation  materials  are  compatible.  The 

installation must be performed by an authorized 

electrician.

2.  Install a properly sized two-pole local disconnect to 

enable total isolation for servicing.  GFI protection 

is required.

3.  Use properly sized copper wire for connection to 

the panel.

4.  Connect thermostats.

5.  Seal the conduits which run into the unit using a duct 

sealing compound for both water and electrical, after 

the water and electrical connections have been made, 

for sound attenuation.

6.  Install the heating unit cover. Test run for 1 hour 

and then open for a check.  If necessary clean, 

check for dryness, and test run again.  If moisture 

is still present, re-install construction heater and 

run until the system is dry.

7.  Install  the  sound  insulating  foam-rubber  mat 

between  the  heating  unit  cover  and  the  floor 

hatch. 

8.  Install  the  floor  hatch.    If  desired,  use  standard 

transition trim between the hatch and the floor.

Overheating Protection

If the overheating protection has tripped, then complete 

the following steps:

1.  Turn off the power.

2.  Carefully investigate the reason for the overheating. 

Any  repairs  should  only  be  performed  by  an 

authorized electrician.

1

3

2

4

sound insulation

mat, 30 mm (1")

floor hatch

heating unit

cover

electrical connections

heating insert

heating unit box

hole for water pipe return for future

hole for water pipe inlet for future

water pipe 

connections 

for future 

conversion to 

water

electrical 

connections

4000E-24

heating unit box 

4000A 50/50 (2") 

Heating unit box 

4000A 100/100 (4") 

is similar

4.  Clean  the  furnace  box  carefully.  No  water  or 

dampness should be in the box or pipe system when 

installing the permanent insert.

5.  Install the heating unit insert with the terminal block 

turned  towards  the  electric  connection  conduit 

openings.

26

1

2

3

4

5

6

7

8

9

10

11

12

L2

L1

1

1

1

1

1

1

1

K1

K2

K3

K4

1250W

1250W

1250W

1250W

75

° C

(167° F)

O.H.

110

º 

C (230

º 

F) 

O.H.

50

o

T.B.

24V

Black

Blue

Br

o

w

n

1

2

3

R

C

W

C

230V
60Hz

30A

230V

24V

Thermostat 1

R

C

W

Thermostat 2

R

C

W

Thermostat 3

R

C

W

Thermostat 4

M

400mA

R C

W

R C

W

R C

W

R C

W

Fan

1

2

4

1

2

3

4

230V

400mA

75

° C

(167° F)

O.H.

75

° C

(167° F)

O.H.

75

° C

(167° F)

O.H.

110

º 

C (230

º 

F) 

O.H.

Contactors marked K1 - K4

O.H.= Overheating protection device

If 1 - 3 thermostats are used,  or if more than one thermostat

is installed in the same room, install a jumper between the 

connection blocks 3, 6, 9 and 12 as required.

Refer to the floor plan for thermostat locations.