![Lefroy Brooks X1-2010 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/lefroy-brooks/x1-2010/x1-2010_installation-operating-and-maintanance-instructions_1868392005.webp)
7
8
5
6
5
Installation Procedure
Steps 5-8
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
5
Take out the stopper.
6
Turn on the flow controller. Turn the thermostatic cartridge till you get the water temperature at
38°. Suggestion: attach a hose to the outlets and guide the water tothe basin or another
container to test the temperature and prevent it from spilling on the floor.
7
Turn off the water supply. Install the stopper and make sure its “B” plane, as shown, is horizontal
and on the left side.
8
Fix the stem extension and the adjusting ring.