background image

8

Safety Tips, Care and Maintenance

Safety Tips

If you are soldering during faucet installation,remove cartridges, seats, gaskets and washers prior to 
applying flame, otherwise you will void the warranty.

Cover drain openings to avoid losing small parts.

When cutting or soldering pipe, use safety glasses to protect your eyes.

Important Points

Prior to beginning installation. turn off the cold and hot water lines and open the old faucet to release
built-up pressure.

Overtightening nuts may cause damage.

Wrap all threaded connections with pipe tape available at your local plumbing supply store.
Always wrap in a clockwise direction. The fittings should be installed by a state-licenced plumber.

Please note:
When there is a difference in water pressure between hot and cold supplies to the mixing valve, the 
pressures should be equalized by a plumber in accordance with best practice and legislation.

Maintenance

Your new bathroom faucet is designed for years of trouble-free performance. Keep it looking new by 
cleaning it periodically with a soft cloth. Avoid abrasive cleaners, wire wool and harsh chemicals as 
these will dull the finish and void your warranty.

Routine Maintenance

The frequency and extent of attention required will vary according to prevailing site and operational 
conditions, however a 12 monthly maintenance schedule is recommended.

If the product has operated satisfactorily for some time, but performance has been degraded, please 
check the Fault Finder section to identify the problem.

Maintenance Check List

 s 7ORNORDAMAGEDSEALSANDWASHERS
 s $AMAGEDSEALFACES
 s 4HREADWEAR
 s )NCORRECTADJUSTMENT
 s #OMPONENTFAILURE
 s $EBRISORLIMESCALEBUILDUP

Содержание M1-2400

Страница 1: ...INSTALLATION OPERATING MAINTENANCE INSTRUCTIONS M1 2400 MH 1270 CROSS HANDLE WALL MOUNTED 3 HOLE BATH FILLER TRIM ONLY TO SUIT R1 4035 ROUGH...

Страница 2: ...2 Contents Dimensions 3 InstalLation Procedure 4 Parts List 6 Fault Finder 7 Safety Tips Care and Maintenance 8 Guarantee 9...

Страница 3: ...60mm 8 203mm 3 1 2 88 6mm 2 1 1 1 6 6 8 m m 3 77mm 3 Dimensions in Inches Millimetres Whilst every effort is made to ensure accuracy design and dimensions are subject to change without notice as part...

Страница 4: ...tion Procedure Lefroy Brooks always recommends that plumbing products be installed by a licensed professional Shut off main water supply before installation 1 Install the extension stem 2 Install the...

Страница 5: ...ed professional Shut off main water supply before installation 3 Install the spout and x it tightly with set screw 4 After installing faucet remove aerator and open the hot and cold supplies Check for...

Страница 6: ...or 067773 6 Clip 012242 7 Canopy 018014 8 Adaptor 057507 9 Screw 075043 10 Stem extension 110490 11 Escutcheon 071325 12 O ring 004640N 13 O ring 063030 14 Handle C 029685C 15 Set screw 008701 16 Alle...

Страница 7: ...cation Drips from spout Gasket is mis tted or damaged Check for gasket placement Aerator leaks or has an inconsistent water ow pattern Aerator is dirty or mis tted Unscrew the aerator to check rubber...

Страница 8: ...ater pressure between hot and cold supplies to the mixing valve the pressures should be equalized by a plumber in accordance with best practice and legislation Maintenance Your new bathroom faucet is...

Страница 9: ...hem to be free of design and production faults at the time of delivery and that with correct use and care in accordance with our printed instructions they will function reliably Guarantee period s The...

Страница 10: ...s are protected by law and the use or reproduction outside the terms of an agreement is prohibited The right to modify designs and dimensions is reserved Christo Lefroy Brooks is a member of ACID Anti...

Отзывы: