3
4
5
5
Installation Procedure
Steps 3-5
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
3
Install spout and finish installation by inserting set screw into access hole in back of spout and
screw
tightly.
4
Attach hand shower with final trim installation.
5
After installing faucet, remove aerator and open the hot and cold supplies. Check for leaks.
Turn on faucet handle for one minute to flush debris from faucet. Turn off the water supply,
install the canopy and handle, then reassemble the aerator.