![Lefroy Brooks CW-4711 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/lefroy-brooks/cw-4711/cw-4711_installation-operating-and-maintenance-instructions_1868321004.webp)
1
2
Cold
Hot
4
Steps 1-2
Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
1
Install the Hot-side-body in the left hole and the Cold-side-body in the right hole.
2
Install Hot and Cold handle assemblies.